Permit: TC-MDP-1125-00731
Permit Details
Status:
Inspections Complete
Type:
Model Building Permit
Address:
374 E CORONA RD UNIT 1
Address NEW:
374 E CORONA RD UNIT 1
Apply Date:
01/04/2026
Applicant:
Ramon VALDEZ
Description:
Duplex SFR & ADU (Model master plan TC-MDP-1224-01416)
Permit Reviews
Permit Number - TC-MDP-1125-00731
Permit Status: Inspections complete
Permit Description: Duplex SFR & ADU (Model master plan TC-MDP-1224-01416)
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 01/30/2026 | SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.2 | 02/11/2026 | REQUIRES RESUBMIT |
| 07/30/2026 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 07/31/2026 | APPROVED |
| 08/06/2026 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 08/06/2026 | APPROVED |
| 03/04/2026 | SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.3 | 03/17/2026 | APPROVED |
| 01/07/2026 | SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.1 | 01/21/2026 | REQUIRES RESUBMIT |
Conditions
Permit Number - TC-MDP-1125-00731
Permit Status: Inspections complete
Permit Description: Duplex SFR & ADU (Model master plan TC-MDP-1224-01416)
| Date | Description | Comments |
|---|---|---|
| 11/17/2025 | Submit the Air Leakage & Duct Tightness Test Report completed by an Approved Special Inspector prior to Final Inspections. | |
| 11/17/2025 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
| 11/17/2025 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/ | |
| 11/17/2025 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-1125-00731
Permite Description: Duplex SFR & ADU (Model master plan TC-MDP-1224-01416)
Total Outstanding Inspections - 3
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/28/2026 | COT - RSPL - Sewer | N/A | Partial Pass | 04/28/2026 Verified under test from sewer at main near street, okay to backfill with shading progress area. Partial pass pending connection to duplex HCS. |
| 07/22/2026 | COT - BULD - SWG Clearance | N/A | Not Applicable | |
| 07/22/2026 | COT - RSPL - Gas Pressure Test | N/A | Not Applicable |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-1125-00731
Permit Description: Duplex SFR & ADU (Model master plan TC-MDP-1224-01416)
Total Completed Inspections - 18
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/23/2026 | COT - RSPL - Rough Soil | Passed | 3-23-26: underground plumbing verified per approved plans. Okay to backfill using shading materials. Note: will verify greywater at intermediates. |
|
| 03/26/2026 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
| 03/26/2026 | COT - RSBU - Preslab | Passed | ||
| 04/20/2026 | COT - RSBU - Roof Nailing | Passed | 4-20-26: okay to dry-in roof. | |
| 04/22/2026 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | 4-22-26: exterior clips/sheathing approved. | |
| 04/23/2026 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 4-23-26: intermediates approved. | |
| 04/30/2026 | COT - RSPL - Sewer | Passed | 04/30/2026 Building sewer connection to HCS, holding under test with green tracer wire. Main water 3/4" PEX under test with blue tracer, will be in same trench but above sewer line. Okay to backfill with shading. |
|
| 05/20/2026 | BULD - Electrical Clearance | Passed | 5.2026 Approved for eco |
|
| 07/22/2026 | COT - RSBU - Interior Shear Bracing | Passed | ||
| 07/22/2026 | COT - RSEL - Electrical Final | Passed | ||
| 07/22/2026 | COT - RSEL - Electrical Underground | Passed | ||
| 07/22/2026 | COT - RSEL - Outdoor Lighting | Passed | ||
| 07/22/2026 | COT - RSME - Mechanical Final | Passed | ||
| 07/22/2026 | COT - RSPL - Plumbing Final | Passed | ||
| 07/22/2026 | COT - RSPL - Yard Water Line | Passed | ||
| 07/22/2026 | RSBU - Building Progress | Passed | ||
| 07/22/2026 | RSBU - Building Final | Passed | ||
| 08/11/2026 | ENGR Engineering Final | Passed |