Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Inspections Complete
Type:
Model Building Permit
Address NEW:
374 E CORONA RD UNIT 1
Apply Date:
01/04/2026
Applicant:
Ramon VALDEZ
Description:
Duplex SFR & ADU (Model master plan TC-MDP-1224-01416)

Permit Reviews

Permit Number - TC-MDP-1125-00731
Permit Status: Inspections complete
Permit Description: Duplex SFR & ADU (Model master plan TC-MDP-1224-01416)
Start Date Submittal Complete Date Status  
01/30/2026 SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.2 02/11/2026 REQUIRES RESUBMIT Review Details
07/30/2026 BUILDING DEFERRED SUBMITTAL REVIEW v.1 07/31/2026 APPROVED Review Details
08/06/2026 BUILDING DEFERRED SUBMITTAL REVIEW v.1 08/06/2026 APPROVED Review Details
03/04/2026 SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.3 03/17/2026 APPROVED Review Details
01/07/2026 SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.1 01/21/2026 REQUIRES RESUBMIT Review Details

Conditions

Permit Number - TC-MDP-1125-00731
Permit Status: Inspections complete
Permit Description: Duplex SFR & ADU (Model master plan TC-MDP-1224-01416)
Date Description Comments
11/17/2025 Submit the Air Leakage & Duct Tightness Test Report completed by an Approved Special Inspector prior to Final Inspections.
11/17/2025 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.
11/17/2025 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/
11/17/2025 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-1125-00731
Permite Description: Duplex SFR & ADU (Model master plan TC-MDP-1224-01416)
Total Outstanding Inspections - 3
Last Inspection Date Description Inspector Results Comments
04/28/2026 COT - RSPL - Sewer N/A Partial Pass 04/28/2026
Verified under test from sewer at main near street, okay to backfill with shading progress area. Partial pass pending connection to duplex HCS.
07/22/2026 COT - BULD - SWG Clearance N/A Not Applicable
07/22/2026 COT - RSPL - Gas Pressure Test N/A Not Applicable

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-1125-00731
Permit Description: Duplex SFR & ADU (Model master plan TC-MDP-1224-01416)
Total Completed Inspections - 18
Date Description Inspector Results Comments
03/23/2026 COT - RSPL - Rough Soil Passed 3-23-26: underground plumbing verified per approved plans. Okay to backfill using shading materials.
Note: will verify greywater at intermediates.
03/26/2026 COT - RSBU - Excavation/Rebar/Zoning Passed
03/26/2026 COT - RSBU - Preslab Passed
04/20/2026 COT - RSBU - Roof Nailing Passed 4-20-26: okay to dry-in roof.
04/22/2026 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed 4-22-26: exterior clips/sheathing approved.
04/23/2026 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 4-23-26: intermediates approved.
04/30/2026 COT - RSPL - Sewer Passed 04/30/2026
Building sewer connection to HCS, holding under test with green tracer wire. Main water 3/4" PEX under test with blue tracer, will be in same trench but above sewer line. Okay to backfill with shading.
05/20/2026 BULD - Electrical Clearance Passed 5.2026
Approved for eco
07/22/2026 COT - RSBU - Interior Shear Bracing Passed
07/22/2026 COT - RSEL - Electrical Final Passed
07/22/2026 COT - RSEL - Electrical Underground Passed
07/22/2026 COT - RSEL - Outdoor Lighting Passed
07/22/2026 COT - RSME - Mechanical Final Passed
07/22/2026 COT - RSPL - Plumbing Final Passed
07/22/2026 COT - RSPL - Yard Water Line Passed
07/22/2026 RSBU - Building Progress Passed
07/22/2026 RSBU - Building Final Passed
08/11/2026 ENGR Engineering Final Passed

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD (SSRS).PDF DOCUMENTS VIEW
CONS-374 CORONA FULL2_V3.PDF DOCUMENTS VIEW
TC-MDP-1125-00731 COMMENT RESPONSE LETTER-2_V1.PDF DOCUMENTS VIEW
WHOLE SITE CORONA_V2.PDF DOCUMENTS VIEW