Inspection History Details
Inspection Status: Re-inspection required
Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Re-inspection required | 3-23-26: underground plumbing verified per approved plans. Okay to backfill using shading materials. Note: will verify greywater at intermediates. |
||
| 04/22/2026 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Re-inspection required | 4-22-26: add supports to flex at 4' intervals, fix tears to flex at marked locations, add fire foam to top plate penetrations at marked areas, add plastic bushings to protect feeders at subpanels, missing metallic addressing labeling at main panel and install disconnects. | |
| 04/22/2026 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Re-inspection required | 4-22-26: texted poc at called 631am asking for access to site but didn't revive an answer. I then called at 636 and again received no answer. I left site at 650. Reschedule inspections. | |
| 04/23/2026 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 4-23-26: intermediates approved. |