Permit: TC-MDP-1125-00712
Permit Details
Status:
Withdrawn
Type:
Model Building Permit
Address:
4126 S KOSTKA AV
Address NEW:
4126 S KOSTKA AV
Apply Date:
11/14/2025
Applicant:
Albert Quihuis
Description:
SFR (Model master plan TC-MDP-0525-00304)
Permit Reviews
Permit Number - TC-MDP-1125-00712
Permit Status: Withdrawn
Permit Description: SFR (Model master plan TC-MDP-0525-00304)
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 11/17/2025 | SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.1 | 12/05/2025 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TC-MDP-1125-00712
Permit Status: Withdrawn
Permit Description: SFR (Model master plan TC-MDP-0525-00304)
Total Outstanding Activity Conditions - 5
| Date | Name |
|---|---|
| 11/03/2025 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. |
| 11/03/2025 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. |
| 11/03/2025 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/ |
| 11/03/2025 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
| 12/04/2025 | This project requires a Right-of-Way (ROW) permit issued by Department of Transportation and Mobility (DTM) prior to working in the public Right-of-Way. |