Permit Details

Status:
Issued
Type:
Model Building Permit
Address NEW:
1192 E LIGGINS ST
Apply Date:
11/14/2024
Applicant:
Mark Alteri
Description:
PV 2378SFR (Model master plan TC-MDP-0124-00026)

Permit Reviews

Permit Number - TC-MDP-1124-01355
Permit Status: Issued
Permit Description: PV 2378SFR (Model master plan TC-MDP-0124-00026)
Start Date Submittal Complete Date Status  
04/02/2025 SITE FROM MODEL PERMIT - PRODUCTION v.1 04/10/2025 APPROVED Review Details
07/18/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 07/22/2025 APPROVED Review Details
05/05/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 05/05/2025 APPROVED Review Details

Conditions

Permit Number - TC-MDP-1124-01355
Permit Status: Issued
Permit Description: PV 2378SFR (Model master plan TC-MDP-0124-00026)
Date Description Comments
04/04/2025 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
11/22/2024 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.
11/22/2024 Post-Tension Inspection Report is required.
11/22/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.
11/22/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/

Completed Inspections

Permit Status: Issued
Permit Number: TC-MDP-1124-01355
Permit Description: PV 2378SFR (Model master plan TC-MDP-0124-00026)
Total Completed Inspections - 14
Date Description Inspector Results Comments
05/15/2025 COT - RSPL - Rough Soil Passed 5-15-25, underground plumbing inspection approved. Okay to backfill with shading materials
05/15/2025 COT - RSPL - Sewer Passed 5-15-25, underground plumbing & HCS inspection approved. Okay to backfill with shading materials
05/15/2025 COT - RSPL - Yard Water Line Passed 5-15-25, main water line inspection approved. Okay to backfill with shading materials.
05/20/2025 COT - RSBU - Excavation/Rebar/Zoning Passed
05/20/2025 COT - RSBU - Preslab Passed Ensure slab area is termite treated.
05/20/2025 COT - RSEL - Grounding/Bonding Passed
05/20/2025 COT - RSEL - Electrical Underground Passed
06/20/2025 COT - RSBU - Roof Nailing Passed
06/24/2025 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed Ok to move forward to intermediates.
07/14/2025 BULD - Electrical Clearance Passed Ensure address is affixed to panel. Ok to set meter and energize service.
08/01/2025 COT - RSPL - Gas Pressure Test Passed 8-1-25: approved
08/19/2025 COT - RSBU - Interior Shear Bracing Passed
08/19/2025 COT - RSBU - Firewall/Fire Barrier/Firestop Passed
09/30/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 9/30/25 passed

Documents

File Name Document Type  
155157 PT LOT 55 COMPLETE-2025-07-17_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
PRL 55 PLOT PLAN FOR PERMIT_V1.PDF DOCUMENTS VIEW
PRL 55 PT CERT-2025-04-01_V1.PDF DOCUMENTS VIEW