Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Re-inspection required
Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.
Permit Number - TC-MDP-1124-01355
Inspection Description - COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.
Inspection Status - Re-inspection required
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/01/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Re-inspection required | 8-1-25: seal all horizontal penetrations at garage from unconditioned to conditioned space, seal penetrations at vapor barrier at garage east wall, add blocking/firefoam at 1st floor restroom, pex to can lights require a 12" clearance-relocate to allow for clearance or block using drywall, osb, 2x4 (R-3 insulation is not accepted), firefoam penetration at upstairs north bedroom, DWV/Shower tub installed and under test at time of intermediate inspection, make repair to damaged over notched sheathing at kitchen shear wall sheathing, add tape to tear at main feed at above electrical panel, fix tear on flex at kitchen area. | |
| 08/04/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Partial Pass | 8-4-25: partial pass pending shower liner test. Okay to continue with construction. | |
| 09/30/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 9/30/25 passed |