Permit: TC-MDP-1124-01340
Permit Details
Apply Date:
11/12/2024
Applicant:
Frank Maldonado
Description:
SFR 2 Story (Model master plan TC-MDP-1024-01150)
Permit Reviews
Permit Number - TC-MDP-1124-01340
Permit Status: Complete
Permit Description: SFR 2 Story (Model master plan TC-MDP-1024-01150)
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 01/16/2025 | RESTAMP - RESIDENTIAL v.1 | 01/16/2025 | APPROVED |
| 12/04/2024 | SITE FROM MODEL PERMIT - SUBDIVISION v.1 | 12/12/2024 | REQUIRES RESUBMIT |
| 12/16/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 12/22/2025 | APPROVED |
| 01/15/2025 | SITE FROM MODEL PERMIT - SUBDIVISION v.3 | 01/16/2025 | APPROVED |
| 12/23/2024 | SITE FROM MODEL PERMIT - SUBDIVISION v.2 | 01/02/2025 | REQUIRES RESUBMIT |
Conditions
Permit Number - TC-MDP-1124-01340
Permit Status: Complete
Permit Description: SFR 2 Story (Model master plan TC-MDP-1024-01150)
| Date | Description | Comments |
|---|---|---|
| 01/15/2025 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. | |
| 11/21/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
| 11/21/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
| 11/21/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/ |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-MDP-1124-01340
Permite Description: SFR 2 Story (Model master plan TC-MDP-1024-01150)
Total Outstanding Inspections - 10
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/16/2025 | COT - RSBU - Excavation/Rebar/Zoning | N/A | Not Ready | 5-16-25, not ready. |
| 05/16/2025 | COT - RSBU - Preslab | N/A | Not Ready | 5-16-25, not ready. |
| 10/22/2025 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | N/A | Re-inspection required | 10-22-25: SW2 at garage & on other side of staircase calls for anchor bolts 32" o.c. Or Ramset pins at 8" o.c., missing sheathing at shear walls, missing fire blocking at staircase, add a shot pin within 6" at the ends of sill plate, add angle clips to every other stud at upstairs firewall, add nails and 2x4 to damaged sill plate to decking at upstairs southeast bedroom, missing A-35's and at each end of garage and at garage shear wall at 16" o.c., add nails at edge underneath front porch, missing A-34’s at each end of gable end bracing. |
| 12/19/2025 | COT - BULD - SWG Clearance | N/A | Not Applicable | |
| 12/19/2025 | COT - RSPL - Gas Pressure Test | N/A | Not Applicable | |
| 12/19/2025 | COT - RSEL - Electrical Final | N/A | Not Ready | |
| 12/19/2025 | COT - RSEL - Outdoor Lighting | N/A | Not Ready | |
| 12/19/2025 | COT - RSME - Mechanical Final | N/A | Not Ready | |
| 12/19/2025 | COT - RSPL - Plumbing Final | N/A | Not Ready | |
| 12/19/2025 | RSBU - Building Final | N/A | Not Ready |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-1124-01340
Permit Description: SFR 2 Story (Model master plan TC-MDP-1024-01150)
Total Completed Inspections - 19
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/09/2025 | COT - RSPL - Sewer | Passed | ||
| 05/13/2025 | COT - RSEL - Electrical Underground | Passed | 5-13-25, verified depth at 18" together with Schedule 40 electrical conduit in place. Okay to backfill. | |
| 05/19/2025 | COT - RSBU - Excavation/Rebar/Zoning | Passed | 5-19-25, excavation/rebar/setbacks verified as per plans. Okay to pour concrete. | |
| 05/19/2025 | COT - RSBU - Preslab | Passed | 5-19-25, preslab,excavation/rebar/setbacks verified as per plans. Okay to pour concrete | |
| 09/26/2025 | COT - RSBU - Roof Nailing | Passed | ||
| 10/14/2025 | BULD - Electrical Clearance | Passed | 10-14-25: okay to energize panel. ECO clearance sent to TEP. | |
| 10/14/2025 | COT - RSEL - Grounding/Bonding | Passed | 10-14-25: verified UFER-no water/gas bonding required. | |
| 10/22/2025 | COT - RSPL - Yard Water Line | Passed | 10-22-25: main water line approved. Okay to backfill with shading materials. | |
| 11/05/2025 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | 11-5-25: corrections made-exterior clips/sheathing and framing approved. | |
| 11/05/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 11-5-25: intermediates approved-okay to continue with construction. | |
| 11/21/2025 | COT - RSBU - Interior Shear Bracing | Passed | ||
| 12/18/2025 | COT - RSPL - Rough Soil | Passed | ||
| 12/18/2025 | ENGR Engineering Final | Passed | Site is complete in accordance with approved plans. | |
| 12/18/2025 | RSBU - Building Progress | Passed | ||
| 01/13/2026 | COT - RSEL - Electrical Final | Passed | ||
| 01/13/2026 | COT - RSEL - Outdoor Lighting | Passed | ||
| 01/13/2026 | COT - RSME - Mechanical Final | Passed | ||
| 01/13/2026 | COT - RSPL - Plumbing Final | Passed | ||
| 01/13/2026 | RSBU - Building Final | Passed |