Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Inspections Complete
Type:
Model Building Permit
Address NEW:
9131 E INDIGO BLUFF ST
Apply Date:
11/12/2024
Applicant:
Celina Rodriguez
Description:
SFR BT2685-228 T22-M0012 (Model master plan TC-MDP-1222-00148)

Permit Reviews

Permit Number - TC-MDP-1124-01333
Permit Status: Inspections complete
Permit Description: SFR BT2685-228 T22-M0012 (Model master plan TC-MDP-1222-00148)
Start Date Submittal Complete Date Status  
04/15/2025 SITE FROM MODEL PERMIT - SUBDIVISION v.1 04/23/2025 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-1124-01333
Permit Status: Inspections complete
Permit Description: SFR BT2685-228 T22-M0012 (Model master plan TC-MDP-1222-00148)
Total Outstanding Activity Conditions - 3
Date Name
04/21/2025 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
04/21/2025 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
11/21/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/

Conditions

Permit Number - TC-MDP-1124-01333
Permit Status: Inspections complete
Permit Description: SFR BT2685-228 T22-M0012 (Model master plan TC-MDP-1222-00148)
Date Description Comments
11/21/2024 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.
11/21/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.

Outstanding Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-1124-01333
Permite Description: SFR BT2685-228 T22-M0012 (Model master plan TC-MDP-1222-00148)
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
05/14/2025 COT - RSEL - Grounding/Bonding N/A Partial Pass Partial pass 5/14/25 for ufer, will check connection at later date

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-1124-01333
Permit Description: SFR BT2685-228 T22-M0012 (Model master plan TC-MDP-1222-00148)
Total Completed Inspections - 21
Date Description Inspector Results Comments
05/02/2025 COT - RSPL - Yard Water Line Passed Passed 5/2/25 ok to backfill
05/02/2025 COT - RSPL - Sewer Passed Passed 5/2/25 ok to backfill
05/02/2025 COT - RSPL - Rough Soil Passed Passed 5/2/25 ok to backfill
05/14/2025 COT - RSBU - Excavation/Rebar/Zoning Passed Passed 5/14/25 ok to pour concrete
05/14/2025 COT - RSBU - Preslab Passed Passed 5/14/25 ok to pour concrete
05/14/2025 COT - RSEL - Electrical Underground Passed Passed 5/14/25 ok to pour concrete
05/27/2025 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed
05/27/2025 COT - RSBU - Roof Nailing Passed
06/10/2025 BULD - Electrical Clearance Passed Ready for temp power CLEARANCE ECO
06/17/2025 COT - RSEL - Grounding/Bonding Passed
06/17/2025 COT - RSPL - Gas Pressure Test Passed
06/20/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 6/20/25 corrections made
07/01/2025 COT - RSBU - Interior Shear Bracing Passed
08/12/2025 COT - BULD - SWG Clearance Passed Passed CLEARANCE SWG 8/12/25
08/21/2025 COT - RSEL - Electrical Final Passed 8.21.25
APPROVED
08/21/2025 COT - RSEL - Outdoor Lighting Passed 8.21.25
APPROVED
08/21/2025 COT - RSME - Mechanical Final Passed 8.21.25
APPROVED
08/21/2025 COT - RSPL - Plumbing Final Passed 8.21.25
APPROVED
08/21/2025 RSBU - Building Final Passed 8.21.25
APPROVED
08/21/2025 RSBU - Building Progress Passed 8.21.25
APPROVED
08/22/2025 ENGR Engineering Final Passed Site is complete and in accordance with approved plans.

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
BELLA TIERRA PHASE 3 - LOT 6 START_V1.PDF DOCUMENTS VIEW
BTIII 6 SIC-2025-04-08_V1.PDF DOCUMENTS VIEW