Permit Details

Status:
Complete
Type:
Model Building Permit
Address:
9564 E HARKES DR
Address NEW:
9564 E HARKES DR
Apply Date:
11/14/2024
Applicant:
Brianna Quiroz
Description:
Indiana Dunes Model Plan La Escalera (Model master plan TC-MDP-1222-00130)

Permit Reviews

Permit Number - TC-MDP-1124-01321
Permit Status: Complete
Permit Description: Indiana Dunes Model Plan La Escalera (Model master plan TC-MDP-1222-00130)
Start Date Submittal Complete Date Status  
11/15/2024 SITE FROM MODEL PERMIT - PRODUCTION v.1 12/05/2024 APPROVED Review Details
07/11/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 07/14/2025 APPROVED Review Details

Conditions

Permit Number - TC-MDP-1124-01321
Permit Status: Complete
Permit Description: Indiana Dunes Model Plan La Escalera (Model master plan TC-MDP-1222-00130)
Date Description Comments
11/14/2024 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.
07/14/2025 Post-Installed Anchor Inspection Report is required.
11/19/2024 Post-Tension Inspection Report is required.
11/14/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.
11/14/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/
11/19/2024 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
11/19/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-MDP-1124-01321
Permite Description: Indiana Dunes Model Plan La Escalera (Model master plan TC-MDP-1222-00130)
Total Outstanding Inspections - 3
Last Inspection Date Description Inspector Results Comments
01/06/2025 COT - RSPL - Yard Water Line N/A Re-inspection required Water lines are not under pressure and not connected to main supply lines.
03/04/2025 COT - BULD - SWG Clearance N/A Not Applicable
03/04/2025 COT - RSPL - Gas Pressure Test N/A Not Applicable

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-1124-01321
Permit Description: Indiana Dunes Model Plan La Escalera (Model master plan TC-MDP-1222-00130)
Total Completed Inspections - 19
Date Description Inspector Results Comments
01/06/2025 COT - RSPL - Rough Soil Passed Underground plumbing is complete and connected to main sewer line. Entire system is under a water test with no leaks.
01/06/2025 COT - RSPL - Sewer Passed Underground plumbing is complete and connected to main sewer line. Entire system is under a water test with no leaks.
01/13/2025 COT - RSBU - Excavation/Rebar/Zoning Passed Rebar and hold downs per plan, ok to pour concrete 1/13/25
01/13/2025 COT - RSBU - Preslab Passed Rebar and hold downs per plan, ok to pour concrete 1/13/25
01/13/2025 COT - RSEL - Electrical Underground Passed Rebar and hold downs per plan, ok to pour concrete 1/13/25
01/13/2025 COT - RSEL - Grounding/Bonding Passed Rebar and hold downs per plan, ok to pour concrete 1/13/25
02/04/2025 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed 2/4/25 corrections made
02/04/2025 COT - RSBU - Roof Nailing Passed 2/4/25 corrections made
03/04/2025 COT - RSPL - Yard Water Line Passed 4 March 25
pass
03/04/2025 BULD - Electrical Clearance Passed 4 March 25

TEP CLEARANCE: ECO
03/05/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 3/5/25 corrections made
03/24/2025 COT - RSBU - Interior Shear Bracing Passed Passed 3/24/25
08/12/2025 COT - RSEL - Electrical Final Passed 8.12.25
Finals verified
08/12/2025 COT - RSEL - Outdoor Lighting Passed 8.12.25
Finals verified
08/12/2025 COT - RSME - Mechanical Final Passed 8.12.25
Finals verified
08/12/2025 COT - RSPL - Plumbing Final Passed 8.12.25
Finals verified
08/12/2025 ENGR Engineering Final Passed
08/12/2025 RSBU - Building Final Passed 8.12.25
Finals verified
08/12/2025 RSBU - Building Progress Passed

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
LOT 34 SIC-2025-07-09_V1.PDF DOCUMENTS VIEW
USE - PATTISON SOILS REPORT 1.25.2022_V1.PDF DOCUMENTS VIEW
Z490 INDIANA DUNES- TRUSS REVIEW LETTER - LAYOUT_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
PHASE 1 LOT 34 PLOT PLAN_V1.PDF DOCUMENTS VIEW
PHASE 1A LOT 34 SIC-2024-11-14_V1.PDF DOCUMENTS VIEW