Permit Details

Status:
Complete
Type:
Model Building Permit
Address NEW:
6472 E PASEO BARANDA
Apply Date:
11/12/2024
Applicant:
Brianna Quiroz
Description:
Harding SFR Model La Estancia (roof vent update) (Model master plan TC-MDP-0123-00365)

Permit Reviews

Permit Number - TC-MDP-1124-01300
Permit Status: Complete
Permit Description: Harding SFR Model La Estancia (roof vent update) (Model master plan TC-MDP-0123-00365)
Start Date Submittal Complete Date Status  
07/03/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 07/03/2025 REQUIRES RESUBMIT Review Details
11/15/2024 SITE FROM MODEL PERMIT - SUBDIVISION v.1 11/20/2024 APPROVED Review Details
07/15/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.2 07/16/2025 APPROVED Review Details

Conditions

Permit Number - TC-MDP-1124-01300
Permit Status: Complete
Permit Description: Harding SFR Model La Estancia (roof vent update) (Model master plan TC-MDP-0123-00365)
Date Description Comments
11/19/2024 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
11/08/2024 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.
11/19/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
07/03/2025 Post-Installed Anchor Inspection Report is required.
11/08/2024 Post-Tension Inspection Report is required.
11/08/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.
11/08/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/
11/19/2024 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
11/19/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-MDP-1124-01300
Permite Description: Harding SFR Model La Estancia (roof vent update) (Model master plan TC-MDP-0123-00365)
Total Outstanding Inspections - 3
Last Inspection Date Description Inspector Results Comments
01/23/2025 COT - BULD - SWG Clearance N/A Not Applicable
01/23/2025 COT - RSPL - Gas Pressure Test N/A Not Applicable
04/10/2025 COT - RSBU - Interior Shear Bracing N/A Canceled Canceled per contractor. 4/10/2025

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-1124-01300
Permit Description: Harding SFR Model La Estancia (roof vent update) (Model master plan TC-MDP-0123-00365)
Total Completed Inspections - 19
Date Description Inspector Results Comments
01/24/2025 COT - RSPL - Rough Soil Passed 1/24/25 pass ok to backfill, shading required
01/24/2025 COT - RSPL - Sewer Passed 1/24/25 pass ok to backfill, shading required
01/24/2025 COT - RSPL - Yard Water Line Passed 1/24/25 pass ok to backfill, shading required
01/30/2025 COT - RSBU - Excavation/Rebar/Zoning Passed 1/30/25 pass
01/30/2025 COT - RSBU - Preslab Passed 1/30/25 pass
01/30/2025 COT - RSEL - Electrical Underground Passed 1/30/25 pass
02/24/2025 COT - RSBU - Roof Nailing Passed
02/27/2025 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed 26 FEB 25
Pass
03/11/2025 BULD - Electrical Clearance Passed 3-11-25, panel okay to be energized. ECO clearance sent to TEP.
03/25/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed Passed 3/25/25 ok to drywall
03/24/2025 COT - RSEL - Grounding/Bonding Passed 3/24/25 passed
04/14/2025 COT - RSBU - Interior Shear Bracing Passed
07/21/2025 COT - RSEL - Electrical Final Passed 7-21-25: plumbing, outdoor lighting, electrical final approved.
07/21/2025 COT - RSEL - Outdoor Lighting Passed 7-21-25: plumbing, outdoor lighting, electrical final approved.
07/21/2025 COT - RSPL - Plumbing Final Passed 7-21-25: plumbing, outdoor lighting, electrical final approved.
07/21/2025 RSBU - Building Progress Passed
07/23/2025 COT - RSME - Mechanical Final Passed 7-23-25:mechanical & building finals approved.
07/23/2025 ENGR Engineering Final Passed
07/23/2025 RSBU - Building Final Passed 7-23-25:mechanical & building finals approved.

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
LA ESTANCIA BLOCK 6 LOT 102 FINAL SIC-2025-07-11_V2.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
LA ESTANCIA BLOCK 6 LOT 102 PRE SIC-2024-11-12_V1.PDF DOCUMENTS VIEW
LAE PARCEL 6 LOT 102_V1.PDF DOCUMENTS VIEW