Inspection History Details
Inspection Status: Not Ready
Inspection History: ENGR Engineering Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/21/2025 | ENGR Engineering Final | Not Ready | Solar meter housing needs to have the blank plate installed until meter is set. | |
| 07/23/2025 | ENGR Engineering Final | Passed |