Permit Details

Status:
Complete
Type:
Model Building Permit
Address NEW:
6460 E PASEO BARANDA
Apply Date:
12/06/2024
Applicant:
Brianna Quiroz
Description:
Roosevelt Model SFR La Estancia (Model master plan TC-MDP-0123-00366)

Permit Reviews

Permit Number - TC-MDP-1124-01293
Permit Status: Complete
Permit Description: Roosevelt Model SFR La Estancia (Model master plan TC-MDP-0123-00366)
Start Date Submittal Complete Date Status  
09/18/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 09/19/2025 APPROVED Review Details
12/12/2024 SITE FROM MODEL PERMIT - SUBDIVISION v.1 12/20/2024 APPROVED Review Details

Conditions

Permit Number - TC-MDP-1124-01293
Permit Status: Complete
Permit Description: Roosevelt Model SFR La Estancia (Model master plan TC-MDP-0123-00366)
Date Description Comments
12/16/2024 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
11/08/2024 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.
12/16/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
12/16/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
11/08/2024 Post-Tension Inspection Report is required.
11/08/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.
11/08/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/
12/16/2024 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
12/16/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-MDP-1124-01293
Permite Description: Roosevelt Model SFR La Estancia (Model master plan TC-MDP-0123-00366)
Total Outstanding Inspections - 3
Last Inspection Date Description Inspector Results Comments
04/07/2025 COT - BULD - SWG Clearance N/A Not Applicable
04/07/2025 COT - RSPL - Gas Pressure Test N/A Not Applicable
06/25/2025 COT - RSBU - Interior Shear Bracing N/A Not Applicable

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-1124-01293
Permit Description: Roosevelt Model SFR La Estancia (Model master plan TC-MDP-0123-00366)
Total Completed Inspections - 18
Date Description Inspector Results Comments
04/07/2025 COT - RSEL - Electrical Underground Passed
04/07/2025 COT - RSPL - Rough Soil Passed
04/07/2025 COT - RSPL - Sewer Passed
04/07/2025 COT - RSPL - Yard Water Line Passed
04/09/2025 COT - RSBU - Excavation/Rebar/Zoning Passed Excavation/rebar/serbacks approved plans. Okay to pour concrete.
04/09/2025 COT - RSBU - Preslab Passed 4-9-25, preslab approved. Okay to pour concrete.
05/14/2025 COT - RSBU - Roof Nailing Passed
05/16/2025 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed 5/16/25
Pass
06/04/2025 COT - RSEL - Grounding/Bonding Passed
06/10/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 6-10-25: missing nail plates at marked locations interior side sheathing of garage. Nail plates installed. EWS
07/25/2025 BULD - Electrical Clearance Passed 7.9.25 electrical verified per plan. Deadfront has no missing spaces. Future PV marked. Non metallic labeled at panel. Address label verified. No open knockouts. Grounding/bonding verified. Current present Breakers labeled. Number of circuits per revised plan/letter.
7/25/25: ECO
09/29/2025 COT - RSEL - Electrical Final Passed 9.29.25
APPROVED
09/29/2025 COT - RSEL - Outdoor Lighting Passed 9.29.25
APPROVED
09/29/2025 COT - RSME - Mechanical Final Passed 9.29.25
APPROVED
09/29/2025 COT - RSPL - Plumbing Final Passed 9.29.25
APPROVED
09/29/2025 ENGR Engineering Final Passed Site is clean and accessible; built in accordance with approved plans.
09/29/2025 RSBU - Building Final Passed 9.29.25
APPROVED
09/29/2025 RSBU - Building Progress Passed 9.29.25
APPROVED

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
LA ESTANCIA BLOCK 6 LOT 105 FINAL SIC-2025-09-11_V1.PDF DOCUMENTS VIEW
Z370 ROOSEVELT TRUSS CALCS (2025)_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
LA ESTANCIA BLOCK 6 LOT 105 PRE SIC-2024-12-06_V1.PDF DOCUMENTS VIEW
LAE PARCEL 6 LOT 105_V1.PDF DOCUMENTS VIEW