Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Re-inspection required
Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.
| Date |
Description |
Inspector |
Results |
Comments |
| 06/06/2025 |
COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. |
|
Re-inspection required |
6-6-25: add straps to a/c line set at kitchen, firefoam penetrations at garage, northeast bedroom at penetration where data line runs from through decking, firefoam chutes at garage, behind shower, and at near bathtub, seal vapor barrier at marked location west wall of garage. |
| 06/09/2025 |
COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. |
|
Re-inspection required |
6-9-25: firefoam penetrations at westside of garage, firefoam chutes-see previous notes, add strap to a/c line set next to upstairs shower, seal vapor barrier at marked location at staircase, add nail plates at garage shear wall-less than 1 1/4" of edge. |
| 06/10/2025 |
COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. |
|
Passed |
6-10-25: missing nail plates at marked locations interior side sheathing of garage. Nail plates installed. EWS |