Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Model Building Permit
Address NEW:
263 N SUNNY COVE PL
Apply Date:
11/01/2024
Applicant:
Dana Petty
Description:
SFR MER1402370 T21-M0077 REV1 roof covering change (Model Master plan TC-MDP-0223-00506)

Permit Reviews

Permit Number - TC-MDP-1124-01267
Permit Status: Complete
Permit Description: SFR MER1402370 T21-M0077 REV1 roof covering change (Model Master plan TC-MDP-0223-00506)
Start Date Submittal Complete Date Status  
11/04/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 11/06/2025 APPROVED Review Details
12/12/2024 SITE FROM MODEL PERMIT - PRODUCTION v.1 12/20/2024 APPROVED Review Details
01/30/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 02/03/2025 APPROVED Review Details

Conditions

Permit Number - TC-MDP-1124-01267
Permit Status: Complete
Permit Description: SFR MER1402370 T21-M0077 REV1 roof covering change (Model Master plan TC-MDP-0223-00506)
Date Description Comments
12/16/2024 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
11/01/2024 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.
12/16/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
01/31/2025 Post-Installed Anchor Inspection Report is required.
12/16/2024 Post-Tension Inspection Report is required.
11/01/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.
11/01/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/
12/16/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-1124-01267
Permit Description: SFR MER1402370 T21-M0077 REV1 roof covering change (Model Master plan TC-MDP-0223-00506)
Total Completed Inspections - 21
Date Description Inspector Results Comments
08/13/2025 COT - RSPL - Rough Soil Passed Passed 8/13/25
08/13/2025 COT - RSPL - Sewer Passed Passed 8/13/25
08/19/2025 COT - RSPL - Yard Water Line Passed
08/20/2025 COT - RSBU - Excavation/Rebar/Zoning Passed 8.20.25
Passed
Ok to pour
08/20/2025 COT - RSBU - Preslab Passed 8.20.25
Passed
Ok to pour
08/20/2025 COT - RSEL - Electrical Underground Passed 8.20.25
Passed
Ok to pour
08/20/2025 COT - RSEL - Grounding/Bonding Passed 8.20.25
Passed
Ok to pour
09/02/2025 COT - RSBU - Roof Nailing Passed
09/04/2025 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed
09/17/2025 BULD - Electrical Clearance Passed 9.17.25
APPROVED
09/17/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 9.17.25
APPROVED
09/17/2025 COT - RSPL - Gas Pressure Test Passed 9.17.25
APPROVED
09/29/2025 COT - RSBU - Interior Shear Bracing Passed
10/28/2025 COT - BULD - SWG Clearance Passed Passed 10/28/25 CLEARANCE SWG
11/03/2025 COT - RSEL - Electrical Final Passed
11/03/2025 COT - RSEL - Outdoor Lighting Passed
11/03/2025 COT - RSME - Mechanical Final Passed
11/03/2025 COT - RSPL - Plumbing Final Passed
11/03/2025 ENGR Engineering Final Passed Site is complete in accordance with approved plans. Engineering is okay for CofO.
11/03/2025 RSBU - Building Final Passed
11/03/2025 RSBU - Building Progress Passed

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
242218-HOUGHTON RESERVE-LOT 161 PT-2025-10-31_V1.PDF DOCUMENTS VIEW
LOT 161 SPECIAL INSPECTION CERTIFICATE REVISED-2025-01-28_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
LOT 161 PLOT PLAN_V1.PDF DOCUMENTS VIEW
LOT 161 SPECIAL INSPECTION CERTIFICATE-2024-12-05_V1.PDF DOCUMENTS VIEW