Permit: TC-MDP-1124-01265
Permit Details
Status:
Complete
Type:
Model Building Permit
Address:
280 N SUNNY COVE PL
Address NEW:
280 N SUNNY COVE PL
Apply Date:
11/04/2024
Applicant:
Dana Petty
Description:
SFR MER1402370 T21-M0077 REV1 roof covering change (Model Master plan TC-MDP-0223-00506)
Permit Reviews
Permit Number - TC-MDP-1124-01265
Permit Status: Complete
Permit Description: SFR MER1402370 T21-M0077 REV1 roof covering change (Model Master plan TC-MDP-0223-00506)
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 01/30/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 02/03/2025 | APPROVED |
| 03/28/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 04/01/2025 | APPROVED |
| 11/07/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 11/14/2024 | APPROVED |
Conditions
Permit Number - TC-MDP-1124-01265
Permit Status: Complete
Permit Description: SFR MER1402370 T21-M0077 REV1 roof covering change (Model Master plan TC-MDP-0223-00506)
| Date | Description | Comments |
|---|---|---|
| 11/07/2024 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
| 11/01/2024 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. | |
| 11/07/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
| 01/31/2025 | Post-Installed Anchor Inspection Report is required. | |
| 11/07/2024 | Post-Tension Inspection Report is required. | |
| 11/01/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
| 11/01/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/ | |
| 11/07/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-1124-01265
Permit Description: SFR MER1402370 T21-M0077 REV1 roof covering change (Model Master plan TC-MDP-0223-00506)
Total Completed Inspections - 22
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/12/2025 | COT - RSPL - Backwater Valve | Passed | Underground plumbing is complete and connected to HCS. Backwater valve is installed between clean outs. Entire system is under a water test with no leaks. Okay to shade pipes and backfill trenches. | |
| 02/12/2025 | COT - RSPL - Sewer | Passed | Underground plumbing is complete and connected to HCS. Backwater valve is installed between clean outs. Entire system is under a water test with no leaks. Okay to shade pipes and backfill trenches. | |
| 02/12/2025 | COT - RSPL - Rough Soil | Passed | Underground plumbing is complete and connected to HCS. Backwater valve is installed between clean outs. Entire system is under a water test with no leaks. Okay to shade pipes and backfill trenches. | |
| 02/12/2025 | COT - RSPL - Yard Water Line | Passed | Main water line is trenched and installed from meter box to house. System is under street pressure with no leaks. Okay to shade pipe and backfill trench. | |
| 02/19/2025 | COT - RSBU - Excavation/Rebar/Zoning | Passed | Concrete forms are set, masa clips and Simpson shear wall brackets are nailed to the form per plan requirements. Underground plumbing is properly wrapped with foam, shower and bath tub knock-outs are reinforced with rebar. Underground electrical is installed for kitchen island. Ufer ground is installed in bottom of footing of garage. Post tension cabling is evenly spaced. Okay to pour concrete for footings and slab. | |
| 02/19/2025 | COT - RSBU - Preslab | Passed | Concrete forms are set, masa clips and Simpson shear wall brackets are nailed to the form per plan requirements. Underground plumbing is properly wrapped with foam, shower and bath tub knock-outs are reinforced with rebar. Underground electrical is installed for kitchen island. Ufer ground is installed in bottom of footing of garage. Post tension cabling is evenly spaced. Okay to pour concrete for footings and slab. | |
| 02/19/2025 | COT - RSEL - Electrical Underground | Passed | Concrete forms are set, masa clips and Simpson shear wall brackets are nailed to the form per plan requirements. Underground plumbing is properly wrapped with foam, shower and bath tub knock-outs are reinforced with rebar. Underground electrical is installed for kitchen island. Ufer ground is installed in bottom of footing of garage. Post tension cabling is evenly spaced. Okay to pour concrete for footings and slab. | |
| 02/28/2025 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | Passed 2/28/25 ok to proceed to intermediate stage | |
| 02/28/2025 | COT - RSBU - Roof Nailing | Passed | Passed 2/28/25 ok to proceed to intermediate stage | |
| 03/20/2025 | COT - RSEL - Grounding/Bonding | Passed | ||
| 03/20/2025 | BULD - Electrical Clearance | Passed | 20 March 25 TEP CLEARANCE: ECO |
|
| 03/20/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
| 03/20/2025 | COT - RSPL - Gas Pressure Test | Passed | ||
| 04/01/2025 | COT - RSBU - Interior Shear Bracing | Passed | Passed 4/1/25 ok to tape | |
| 05/16/2025 | COT - BULD - SWG Clearance | Passed | Passed 5/16/25 CLEARANCE SWG | |
| 05/22/2025 | COT - RSEL - Electrical Final | Passed | ||
| 05/22/2025 | COT - RSEL - Outdoor Lighting | Passed | ||
| 05/22/2025 | COT - RSME - Mechanical Final | Passed | ||
| 05/22/2025 | COT - RSPL - Plumbing Final | Passed | ||
| 05/22/2025 | RSBU - Building Final | Passed | ||
| 05/22/2025 | RSBU - Building Progress | Passed | ||
| 05/23/2025 | ENGR Engineering Final | Passed |