Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Passed
Inspection History: COT - RSBU - Preslab
Permit Number - TC-MDP-1124-01265
Inspection Description - COT - RSBU - Preslab
Inspection Status - Passed
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/19/2025 | COT - RSBU - Preslab | Passed | Concrete forms are set, masa clips and Simpson shear wall brackets are nailed to the form per plan requirements. Underground plumbing is properly wrapped with foam, shower and bath tub knock-outs are reinforced with rebar. Underground electrical is installed for kitchen island. Ufer ground is installed in bottom of footing of garage. Post tension cabling is evenly spaced. Okay to pour concrete for footings and slab. |