Permit Details

Status:
Inspections
Type:
Model Building Permit
Apply Date:
11/04/2025
Applicant:
Dana Petty
Description:
SFR MER1402370 T21-M0077 REV1 roof covering change (Model Master plan TC-MDP-0223-00506)

Permit Reviews

Permit Number - TC-MDP-1124-01264
Permit Status: Inspections
Permit Description: SFR MER1402370 T21-M0077 REV1 roof covering change (Model Master plan TC-MDP-0223-00506)
Start Date Submittal Complete Date Status  
11/06/2024 SITE FROM MODEL PERMIT - PRODUCTION v.1 11/18/2024 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-1124-01264
Permit Status: Inspections
Permit Description: SFR MER1402370 T21-M0077 REV1 roof covering change (Model Master plan TC-MDP-0223-00506)
Total Outstanding Activity Conditions - 5
Date Name
11/01/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/
11/07/2024 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
11/07/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
11/07/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
11/07/2024 Post-Tension Inspection Report is required.

Conditions

Permit Number - TC-MDP-1124-01264
Permit Status: Inspections
Permit Description: SFR MER1402370 T21-M0077 REV1 roof covering change (Model Master plan TC-MDP-0223-00506)
Date Description Comments
11/01/2024 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.
11/01/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.
11/07/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Inspections
Permit Number: TC-MDP-1124-01264
Permite Description: SFR MER1402370 T21-M0077 REV1 roof covering change (Model Master plan TC-MDP-0223-00506)
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
01/27/2025 COT - RSEL - Grounding/Bonding N/A Canceled 1/27/25: Cancelled by Brit Kindred, requested by mistake.

Completed Inspections

Permit Status: Inspections
Permit Number: TC-MDP-1124-01264
Permit Description: SFR MER1402370 T21-M0077 REV1 roof covering change (Model Master plan TC-MDP-0223-00506)
Total Completed Inspections - 9
Date Description Inspector Results Comments
01/06/2025 COT - RSPL - Backwater Valve Passed
01/06/2025 COT - RSPL - Rough Soil Passed passed.
01/06/2025 COT - RSPL - Sewer Passed
01/06/2025 COT - RSPL - Yard Water Line Passed Passed
01/13/2025 COT - RSBU - Excavation/Rebar/Zoning Passed Concrete forms are set, masa clips and hold downs are properly nailed to form per plan, post tension cabling is properly installed and spaced evenly per plan, underground electrical is in place for kitchen island, all underground plumbing is properly wrapped with foam, Ufer ground is installed in bottom of footer, and rebar reinforcement is installed at garage door and around tub/shower risers. Okay to pour concrete.
01/13/2025 COT - RSBU - Preslab Passed Concrete forms are set, masa clips and hold downs are properly nailed to form per plan, post tension cabling is properly installed and spaced evenly per plan, underground electrical is in place for kitchen island, all underground plumbing is properly wrapped with foam, Ufer ground is installed in bottom of footer, and rebar reinforcement is installed at garage door and around tub/shower risers. Okay to pour concrete.
01/13/2025 COT - RSEL - Electrical Underground Passed Concrete forms are set, masa clips and hold downs are properly nailed to form per plan, post tension cabling is properly installed and spaced evenly per plan, underground electrical is in place for kitchen island, all underground plumbing is properly wrapped with foam, Ufer ground is installed in bottom of footer, and rebar reinforcement is installed at garage door and around tub/shower risers. Okay to pour concrete.
01/27/2025 COT - RSBU - Exterior Clips/Sheathing Passed 1/27/25: Framers have corrected all items noted in the 1/24/25 inspection. Okay to proceed with rough-in of mechanical, plumbing, and electrical.
01/28/2025 COT - RSBU - Roof Nailing Passed 1-28-25, roof nailing approved. Okay to continue with construction.

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
LOT 165 PLOT PLAN_V1.PDF DOCUMENTS VIEW
LOT 165 SPECIAL INSPECTION CERTIFICATE-2024-11-04_V1.PDF DOCUMENTS VIEW