Permit: TC-MDP-1124-01264
Permit Details
Status:
Complete
Type:
Model Building Permit
Address:
295 N SUNNY COVE PL
Address NEW:
295 N SUNNY COVE PL
Apply Date:
11/04/2024
Applicant:
Dana Petty
Description:
SFR MER1402370 T21-M0077 REV1 roof covering change (Model Master plan TC-MDP-0223-00506)
Permit Reviews
Permit Number - TC-MDP-1124-01264
Permit Status: Complete
Permit Description: SFR MER1402370 T21-M0077 REV1 roof covering change (Model Master plan TC-MDP-0223-00506)
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 11/06/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 11/18/2024 | APPROVED |
| 02/27/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 03/03/2025 | APPROVED |
Conditions
Permit Number - TC-MDP-1124-01264
Permit Status: Complete
Permit Description: SFR MER1402370 T21-M0077 REV1 roof covering change (Model Master plan TC-MDP-0223-00506)
| Date | Description | Comments |
|---|---|---|
| 11/07/2024 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
| 11/01/2024 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. | |
| 11/07/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
| 11/07/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
| 11/07/2024 | Post-Tension Inspection Report is required. | |
| 11/01/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
| 11/01/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/ | |
| 11/07/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-1124-01264
Permit Description: SFR MER1402370 T21-M0077 REV1 roof covering change (Model Master plan TC-MDP-0223-00506)
Total Completed Inspections - 22
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/06/2025 | COT - RSPL - Backwater Valve | Passed | ||
| 01/06/2025 | COT - RSPL - Rough Soil | Passed | passed. | |
| 01/06/2025 | COT - RSPL - Sewer | Passed | ||
| 01/06/2025 | COT - RSPL - Yard Water Line | Passed | Passed | |
| 01/13/2025 | COT - RSBU - Excavation/Rebar/Zoning | Passed | Concrete forms are set, masa clips and hold downs are properly nailed to form per plan, post tension cabling is properly installed and spaced evenly per plan, underground electrical is in place for kitchen island, all underground plumbing is properly wrapped with foam, Ufer ground is installed in bottom of footer, and rebar reinforcement is installed at garage door and around tub/shower risers. Okay to pour concrete. | |
| 01/13/2025 | COT - RSBU - Preslab | Passed | Concrete forms are set, masa clips and hold downs are properly nailed to form per plan, post tension cabling is properly installed and spaced evenly per plan, underground electrical is in place for kitchen island, all underground plumbing is properly wrapped with foam, Ufer ground is installed in bottom of footer, and rebar reinforcement is installed at garage door and around tub/shower risers. Okay to pour concrete. | |
| 01/13/2025 | COT - RSEL - Electrical Underground | Passed | Concrete forms are set, masa clips and hold downs are properly nailed to form per plan, post tension cabling is properly installed and spaced evenly per plan, underground electrical is in place for kitchen island, all underground plumbing is properly wrapped with foam, Ufer ground is installed in bottom of footer, and rebar reinforcement is installed at garage door and around tub/shower risers. Okay to pour concrete. | |
| 01/27/2025 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | 1/27/25: Framers have corrected all items noted in the 1/24/25 inspection. Okay to proceed with rough-in of mechanical, plumbing, and electrical. | |
| 01/28/2025 | COT - RSBU - Roof Nailing | Passed | 1-28-25, roof nailing approved. Okay to continue with construction. | |
| 02/20/2025 | BULD - Electrical Clearance | Passed | 2-20-25, panel okay to be energized. ECO clearance issued to TEP | |
| 02/20/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 2-20-25, intermediates approved. Okay to continue with construction | |
| 02/20/2025 | COT - RSPL - Gas Pressure Test | Passed | 2-20-25, approved | |
| 02/20/2025 | COT - RSEL - Grounding/Bonding | Passed | 2-20-25, approved | |
| 03/07/2025 | COT - RSBU - Interior Shear Bracing | Passed | 3-7-25, approved. Okay to tape & texture | |
| 04/16/2025 | COT - BULD - SWG Clearance | Passed | Passed 4/16/25 shut off valves in place | |
| 04/25/2025 | COT - RSEL - Electrical Final | Passed | Passed final 4/25/25 CLEARANCE ECO | |
| 04/25/2025 | COT - RSEL - Outdoor Lighting | Passed | Passed final 4/25/25 | |
| 04/25/2025 | COT - RSME - Mechanical Final | Passed | Passed final 4/25/25 | |
| 04/25/2025 | COT - RSPL - Plumbing Final | Passed | Passed final 4/25/25 | |
| 04/25/2025 | RSBU - Building Final | Passed | Passed final 4/25/25 | |
| 04/25/2025 | RSBU - Building Progress | Passed | Passed final 4/25/25 | |
| 05/01/2025 | ENGR Engineering Final | Passed |