Permit Details

Status:
Inspections Complete
Type:
Model Building Permit
Apply Date:
12/28/2023
Applicant:
Celina Rodriguez
Description:
SFR BT1465-130 T22-M0011

Permit Reviews

Permit Number - TC-MDP-1123-01824
Permit Status: Inspections complete
Permit Description: SFR BT1465-130 T22-M0011
Start Date Submittal Complete Date Status  
12/28/2023 SITE FROM MODEL PERMIT - PRODUCTION v.1 01/03/2024 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-1123-01824
Permit Status: Inspections complete
Permit Description: SFR BT1465-130 T22-M0011
Total Outstanding Activity Conditions - 5
Date Name
01/02/2024 Post-Tension Inspection Report is required.
01/02/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.
12/28/2023 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
12/28/2023 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
12/28/2023 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.

Conditions

Permit Number - TC-MDP-1123-01824
Permit Status: Inspections complete
Permit Description: SFR BT1465-130 T22-M0011
Date Description Comments
11/21/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-1123-01824
Permit Description: SFR BT1465-130 T22-M0011
Total Completed Inspections - 21
Date Description Inspector Results Comments
01/10/2024 COT - RSPL - Yard Water Line Passed
01/10/2024 COT - RSPL - Sewer Passed
01/10/2024 COT - RSPL - Rough Soil Passed
01/17/2024 COT - RSBU - Excavation/Rebar/Zoning Passed
01/17/2024 COT - RSBU - Preslab Passed
01/17/2024 COT - RSEL - Electrical Underground Passed
01/17/2024 COT - RSEL - Grounding/Bonding Passed
02/05/2024 COT - RSBU - Roof Nailing Passed 2/5/24: all corrections made
02/05/2024 COT - RSBU - Exterior Clips/Sheathing Passed 2/5/24: all corrections made
03/01/2024 BULD - Electrical Clearance Passed TEP ECO
03/12/2024 COT - RSPL - Gas Pressure Test Passed
03/13/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 3/13/24: DWV piping is under a water test with no leaks. Okay to proceed with installation of insulation and drywall.
04/01/2024 COT - RSBU - Interior Shear Bracing Passed Interior shear wall on entry side of garage wall is properly screwed at 7" on center throughout. Okay to proceed with tape, texture, and paint.
05/31/2024 COT - BULD - SWG Clearance Passed SWG for meter only
06/13/2024 COT - RSEL - Electrical Final Passed
06/13/2024 COT - RSEL - Outdoor Lighting Passed
06/13/2024 COT - RSME - Mechanical Final Passed
06/13/2024 COT - RSPL - Plumbing Final Passed
06/13/2024 ENGR Engineering Final Passed
06/13/2024 RSBU - Building Final Passed
06/13/2024 RSBU - Building Progress Passed

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
BELLA TIERRA 7 SIC-2023-12-28_V1.PDF DOCUMENTS VIEW
BELLA TIERRA PHASE 1 - LOT 7 START_V1.PDF DOCUMENTS VIEW