Permit Details

Status:
Issued
Type:
Model Building Permit
Apply Date:
11/20/2023
Applicant:
Celina Rodriguez
Description:
Bella Tierra Phase 3 1745-130

Permit Reviews

Permit Number - TC-MDP-1123-01815
Permit Status: Issued
Permit Description: Bella Tierra Phase 3 1745-130
Start Date Submittal Complete Date Status  
12/14/2023 SITE FROM MODEL PERMIT - PRODUCTION v.1 12/21/2023 APPROVED Review Details
11/20/2023 SITE FROM MODEL PERMIT - PRODUCTION v.1 11/27/2023 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-1123-01815
Permit Status: Issued
Permit Description: Bella Tierra Phase 3 1745-130
Total Outstanding Activity Conditions - 6
Date Name
08/23/2023 Post-Tension Inspection Report is required.
08/23/2023 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.
11/20/2023 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
11/20/2023 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
11/22/2023 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
12/20/2023 Submit the Air Leakage & Duct Tightness Test Report completed by an Approved Special Inspector prior to Final Inspections.

Conditions

Permit Number - TC-MDP-1123-01815
Permit Status: Issued
Permit Description: Bella Tierra Phase 3 1745-130
Date Description Comments
08/11/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
11/22/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.

Outstanding Inspections

Permit Status: Issued
Permit Number: TC-MDP-1123-01815
Permite Description: Bella Tierra Phase 3 1745-130
Total Outstanding Inspections - 5
Last Inspection Date Description Inspector Results Comments
12/06/2023 COT - RSPL - Sewer N/A Not Ready
04/03/2024 COT - RSEL - Electrical Final N/A Not Ready House is constructed as Model/sales office; reschedule when converted to SFR.
04/03/2024 COT - RSME - Mechanical Final N/A Not Ready
04/03/2024 COT - RSPL - Plumbing Final N/A Not Ready House constructed as Model; no water at this time. reschedule when converted to SFR.
04/03/2024 RSBU - Building Final N/A Not Ready House is constructed as Model/sales office; reschedule when converted to SFR.

Completed Inspections

Permit Status: Issued
Permit Number: TC-MDP-1123-01815
Permit Description: Bella Tierra Phase 3 1745-130
Total Completed Inspections - 17
Date Description Inspector Results Comments
12/06/2023 COT - RSPL - Yard Water Line Passed
12/06/2023 COT - RSPL - Rough Soil Passed
12/12/2023 COT - RSBU - Preslab Passed
12/12/2023 COT - RSBU - Excavation/Rebar/Zoning Passed
12/12/2023 COT - RSEL - Electrical Underground Passed
12/12/2023 COT - RSEL - Grounding/Bonding Passed
01/09/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
01/09/2024 COT - RSPL - Gas Pressure Test Passed
01/09/2024 COT - RSBU - Exterior Clips/Sheathing Passed
01/09/2024 COT - RSBU - Roof Nailing Passed
01/16/2024 COT - RSBU - Interior Shear Bracing Passed
02/08/2024 BULD - Electrical Clearance Passed
02/08/2024 COT - BULD - SWG Clearance Passed
03/11/2024 COT - RSPL - Sewer Passed
04/03/2024 COT - RSEL - Outdoor Lighting Passed
04/03/2024 RSBU - Building Progress Passed House is constructed as Model/sales office; reschedule when converted to SFR.
04/03/2024 ENGR Engineering Final Passed

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
BELLATIERRA PH 3 - MODEL COMPLEX 9-6-23_V1.PDF DOCUMENTS VIEW
BTIII - LOT 76 START_V1.PDF DOCUMENTS VIEW
CONS-REV1_SALES OFFICE_V1.PDF DOCUMENTS VIEW
REV1_COMMENT RESPONSE_V1.PDF DOCUMENTS VIEW
REV1_MANUAL JSD_V1.PDF DOCUMENTS VIEW
REV1_TRUSS LAYOUT_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
BELLA TIERRA III LOT 76 SIC-2023-11-20_V1.PDF DOCUMENTS VIEW
BELLA TIERRA PHASE 3 - LOT 76 START_V1.PDF DOCUMENTS VIEW