Permit: TC-MDP-1123-01777
Permit Details
Status:
Inspections Complete
Type:
Model Building Permit
Address:
6148 E CAMPOLINA TR
Address NEW:
6148 E CAMPOLINA TR
Apply Date:
11/07/2023
Applicant:
Helen Ormsby
Description:
Blackhawk H30D Model Plan
Permit Reviews
Permit Number - TC-MDP-1123-01777
Permit Status: Inspections complete
Permit Description: Blackhawk H30D Model Plan
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 02/29/2024 | SITE FROM MODEL PERMIT - SUBDIVISION v.2 | 03/18/2024 | APPROVED |
| 09/05/2025 | SITE FROM MODEL PERMIT - SUBDIVISION REVISION v.1 | 09/16/2025 | APPROVED |
| 11/08/2023 | SITE FROM MODEL PERMIT - SUBDIVISION v.1 | 11/15/2023 | REQUIRES RESUBMIT |
| 09/03/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 09/03/2025 | APPROVED |
| 11/06/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 11/06/2025 | APPROVED |
Conditions
Permit Number - TC-MDP-1123-01777
Permit Status: Inspections complete
Permit Description: Blackhawk H30D Model Plan
| Date | Description | Comments |
|---|---|---|
| 11/08/2023 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
| 11/08/2023 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
| 11/14/2023 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
| 10/03/2023 | Post-Tension Inspection Report is required. | |
| 11/07/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
| 11/07/2023 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. | |
| 11/06/2025 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. | |
| 09/07/2023 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-1123-01777
Permit Description: Blackhawk H30D Model Plan
Total Completed Inspections - 22
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/26/2025 | COT - RSPL - Backwater Valve | Passed | ||
| 09/26/2025 | COT - RSPL - Yard Water Line | Passed | ||
| 09/26/2025 | COT - RSPL - Sewer | Passed | ||
| 09/26/2025 | COT - RSPL - Rough Soil | Passed | ||
| 10/03/2025 | COT - RSBU - Preslab | Passed | ||
| 10/14/2025 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
| 10/20/2025 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | 10.20.2025 Corrections made to damaged trusses and engineer letter provided. |
|
| 10/20/2025 | COT - RSBU - Roof Nailing | Passed | 10.20.2025 Corrections made to damaged trusses and engineer letter provided. |
|
| 10/23/2025 | BULD - Electrical Clearance | Passed | 10.23.2025 Clearance to TEP ECO. |
|
| 10/23/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 10.23.2025 Approved. Added nail plates at marked locations and verified panel schedule with garage circuit requirement. |
|
| 10/23/2025 | COT - RSEL - Electrical Underground | Passed | ||
| 10/23/2025 | COT - RSEL - Grounding/Bonding | Passed | ||
| 10/23/2025 | COT - RSPL - Gas Pressure Test | Passed | 10.23.2025 Holding under test. |
|
| 10/30/2025 | COT - RSBU - Interior Shear Bracing | Passed | 10.30.2025 Approved. Added 7:7 on rear bedroom shear wall. |
|
| 12/04/2025 | COT - BULD - SWG Clearance | Passed | 12.4.25 Approved for SWG |
|
| 12/10/2025 | COT - RSEL - Electrical Final | Passed | 12.10.25 APPROVED |
|
| 12/10/2025 | COT - RSEL - Outdoor Lighting | Passed | 12.10.25 APPROVED |
|
| 12/10/2025 | COT - RSME - Mechanical Final | Passed | 12.10.25 APPROVED |
|
| 12/10/2025 | COT - RSPL - Plumbing Final | Passed | 12.10.25 APPROVED |
|
| 12/10/2025 | ENGR Engineering Final | Passed | Site is complete in accordance with approved plans. | |
| 12/10/2025 | RSBU - Building Final | Passed | 12.10.25 APPROVED |
|
| 12/10/2025 | RSBU - Building Progress | Passed | 12.10.25 APPROVED |