Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Inspections Complete
Type:
Model Building Permit
Address NEW:
6164 E CAMPOLINA TR
Apply Date:
11/07/2023
Applicant:
Helen Ormsby
Description:
Blackhawk H30K Model Plan

Permit Reviews

Permit Number - TC-MDP-1123-01776
Permit Status: Inspections complete
Permit Description: Blackhawk H30K Model Plan
Start Date Submittal Complete Date Status  
11/08/2023 SITE FROM MODEL PERMIT - SUBDIVISION v.1 11/15/2023 REQUIRES RESUBMIT Review Details
02/20/2026 BUILDING DEFERRED SUBMITTAL REVIEW v.1 02/24/2026 APPROVED Review Details
09/03/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 09/03/2025 APPROVED Review Details
03/01/2024 SITE FROM MODEL PERMIT - SUBDIVISION v.2 03/18/2024 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-1123-01776
Permit Status: Inspections complete
Permit Description: Blackhawk H30K Model Plan
Total Outstanding Activity Conditions - 1
Date Name
09/07/2023 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Conditions

Permit Number - TC-MDP-1123-01776
Permit Status: Inspections complete
Permit Description: Blackhawk H30K Model Plan
Date Description Comments
11/08/2023 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
11/08/2023 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
11/14/2023 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
10/03/2023 Post-Tension Inspection Report is required.
08/23/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
11/07/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
11/07/2023 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.

Outstanding Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-1123-01776
Permite Description: Blackhawk H30K Model Plan
Total Outstanding Inspections - 2
Last Inspection Date Description Inspector Results Comments
01/30/2026 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing N/A Re-inspection required 1.30.26
Fix over penetration and fastener spacing at T-PLY throughout, multiple examples marked in red
Anchor bolts required as marked
A35 missing at garage corner per sd4-32
Truss ho1 is on site but not on calcs, submit drawing showing actual layout
01/30/2026 COT - RSBU - Roof Nailing N/A Not Ready

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-1123-01776
Permit Description: Blackhawk H30K Model Plan
Total Completed Inspections - 21
Date Description Inspector Results Comments
12/18/2025 COT - RSPL - Rough Soil Passed 12/18/2025
Approved and all fixtures holding under test. Okay to backfill with shadings materials.
12/18/2025 COT - RSPL - Sewer Passed 12/18/2025
Approved and holding under test to HCS with green tracer. Okay to backfill with shadings materials.
12/18/2025 COT - RSPL - Yard Water Line Passed 12/18/2025
Approved and holding under test to meter with blue tracer. Okay to backfill with shadings materials.
12/24/2025 COT - RSBU - Excavation/Rebar/Zoning Passed 2/24/2025
Verified setbacks, approved.
12/24/2025 BULD - Electrical Clearance Passed 2/24/2025
Clearance TEP ECO.
12/24/2025 COT - RSBU - Preslab Passed 12/24/2025
Approved per plans, verified added STHD14 hold down at west side of garage entrance. Okay for concrete placement.
12/24/2025 COT - RSEL - Electrical Underground Passed
12/24/2025 COT - RSEL - Grounding/Bonding Passed 12/24/2025
Tied in to MSP from two ground rods.
02/02/2026 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed 2/2/2026 corrections were made. New truss drawing updated and under review.
02/02/2026 COT - RSBU - Roof Nailing Passed
02/09/2026 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 02/09/2026
Approved, added bracing to air register in upstairs bedroom.
02/09/2026 COT - RSPL - Gas Pressure Test Passed
02/17/2026 COT - RSBU - Interior Shear Bracing Passed
03/18/2026 COT - BULD - SWG Clearance Passed 03/18/2026
Approved clearance for Southwest Gas.
03/23/2026 COT - RSEL - Electrical Final Passed 3.23.26
Approved
03/23/2026 COT - RSEL - Outdoor Lighting Passed 3.23.26
Approved
03/23/2026 COT - RSME - Mechanical Final Passed 3.23.26
Approved
03/23/2026 COT - RSPL - Plumbing Final Passed 3.23.26
Approved
03/23/2026 RSBU - Building Final Passed 3.23.26
Approved
03/23/2026 RSBU - Building Progress Passed 3.23.26
Approved
03/24/2026 ENGR Engineering Final Passed

Documents

File Name Document Type  
BHK 90 SIC FINAL-2026-02-17_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
BHK 90 SIC REVISION_V1.PDF DOCUMENTS VIEW
BHK 90 REVISED D1_V2.PDF DOCUMENTS VIEW