Inspection History Details
Inspection Status: Not Ready
Inspection History: ENGR Engineering Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/23/2026 | ENGR Engineering Final | Not Ready | Incorrect cap glued at HCS in driveway. Glued collar with threaded plug needed for removal when needed. Dumpster needs to be moved away from front of house. |
|
| 03/24/2026 | ENGR Engineering Final | Passed |