Permit Details

Status:
Inspections Complete
Type:
Model Building Permit
Address NEW:
9768 E GRAY HAWK DR
Apply Date:
11/02/2023
Applicant:
Helen Ormsby
Description:
Casas del Cerrito H35G Model Plan

Permit Reviews

Permit Number - TC-MDP-1123-01736
Permit Status: Inspections complete
Permit Description: Casas del Cerrito H35G Model Plan
Start Date Submittal Complete Date Status  
04/12/2024 SITE FROM MODEL PERMIT - SUBDIVISION v.2 04/18/2024 APPROVED Review Details
03/01/2024 SITE FROM MODEL PERMIT - SUBDIVISION v.1 03/08/2024 REQUIRES RESUBMIT Review Details
08/09/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 08/13/2024 APPROVED Review Details
11/03/2023 SITE FROM MODEL PERMIT - SUBDIVISION v.1 11/14/2023 APPROVED Review Details

Conditions

Permit Number - TC-MDP-1123-01736
Permit Status: Inspections complete
Permit Description: Casas del Cerrito H35G Model Plan
Date Description Comments
11/03/2023 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
11/03/2023 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
11/13/2023 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
08/13/2024 Post-Tension Inspection Report is required.
09/11/2023 Post-Tension Inspection Report is required.
08/13/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
08/24/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
11/03/2023 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
11/13/2023 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-1123-01736
Permite Description: Casas del Cerrito H35G Model Plan
Total Outstanding Inspections - 2
Last Inspection Date Description Inspector Results Comments
05/22/2024 COT - RSBU - Excavation/Rebar/Zoning N/A Re-inspection required 5/22/24: rebar not to schedule at front of house .
05/22/2024 COT - RSBU - Preslab N/A Re-inspection required 5/22/24: rebar not to schedule at front of house .

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-1123-01736
Permit Description: Casas del Cerrito H35G Model Plan
Total Completed Inspections - 22
Date Description Inspector Results Comments
05/10/2024 COT - RSPL - Backwater Valve Passed Underground plumbing is properly connected to main sewer line with 2 clean outs and a backwater valve installed, green tracer wire is wrapped around pipe from clean out to sewer tap. Okay to shade pipe and backfill trenches.
05/10/2024 COT - RSPL - Rough Soil Passed Underground plumbing is properly connected to main sewer line with 2 clean outs and a backwater valve installed, green tracer wire is wrapped around pipe from clean out to sewer tap. Okay to shade pipe and backfill trenches.
05/10/2024 COT - RSPL - Sewer Passed
05/10/2024 COT - RSPL - Yard Water Line Passed Water supply line is connected to the city water supply and under street pressure with no leaks. Okay to shade pipe and backfill trench.
05/22/2024 BULD - Electrical Clearance Passed TEP ECO
05/22/2024 COT - RSEL - Electrical Underground Passed
05/22/2024 COT - RSEL - Grounding/Bonding Passed
05/23/2024 COT - RSBU - Excavation/Rebar/Zoning Passed
05/23/2024 COT - RSBU - Preslab Passed
06/03/2024 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed Exterior walls are properly secured to concrete floor with shot pins, a/b bolts, and masa clips. Shear wall is properly secured per the plan.
06/03/2024 COT - RSBU - Roof Nailing Passed Roof trusses are properly nailed and secured to the top plate with nails and H2.5 clips nailed per code.
06/24/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
06/24/2024 COT - RSPL - Gas Pressure Test Passed
07/01/2024 COT - RSBU - Interior Shear Bracing Passed Drywall is properly screwed per plans for the interior shear walls. Okay to proceed with tape, texture, and paint.
08/05/2024 COT - BULD - SWG Clearance Passed Gas valves are installed at kitchen, laundry room, attic, and garage for stove, dryer, furnace, and hot water heater. Okay to install meter and connect gas.
08/21/2024 COT - RSEL - Electrical Final Passed Construction is complete. Mechanical, electrical, and plumbing fixtures are installed and fully functional. Electrical panel is properly labeled for breaker identification and non-metallic plumbing pipes. AFCI & GFCI Breakers are installed in electrical panel as required for bedrooms, bathrooms, kitchen, exterior outlets, and garage outlets. Exterior lights are installed per plan and city regulations. Okay to issue Certificate of Occupancy for this permit and property.
08/21/2024 COT - RSEL - Outdoor Lighting Passed Construction is complete. Mechanical, electrical, and plumbing fixtures are installed and fully functional. Electrical panel is properly labeled for breaker identification and non-metallic plumbing pipes. AFCI & GFCI Breakers are installed in electrical panel as required for bedrooms, bathrooms, kitchen, exterior outlets, and garage outlets. Exterior lights are installed per plan and city regulations. Okay to issue Certificate of Occupancy for this permit and property.
08/21/2024 COT - RSME - Mechanical Final Passed Construction is complete. Mechanical, electrical, and plumbing fixtures are installed and fully functional. Electrical panel is properly labeled for breaker identification and non-metallic plumbing pipes. AFCI & GFCI Breakers are installed in electrical panel as required for bedrooms, bathrooms, kitchen, exterior outlets, and garage outlets. Exterior lights are installed per plan and city regulations. Okay to issue Certificate of Occupancy for this permit and property.
08/21/2024 COT - RSPL - Plumbing Final Passed Construction is complete. Mechanical, electrical, and plumbing fixtures are installed and fully functional. Electrical panel is properly labeled for breaker identification and non-metallic plumbing pipes. AFCI & GFCI Breakers are installed in electrical panel as required for bedrooms, bathrooms, kitchen, exterior outlets, and garage outlets. Exterior lights are installed per plan and city regulations. Okay to issue Certificate of Occupancy for this permit and property.
08/21/2024 ENGR Engineering Final Passed
08/21/2024 RSBU - Building Final Passed Construction is complete. Mechanical, electrical, and plumbing fixtures are installed and fully functional. Electrical panel is properly labeled for breaker identification and non-metallic plumbing pipes. AFCI & GFCI Breakers are installed in electrical panel as required for bedrooms, bathrooms, kitchen, exterior outlets, and garage outlets. Exterior lights are installed per plan and city regulations. Okay to issue Certificate of Occupancy for this permit and property.
08/21/2024 RSBU - Building Progress Passed Construction is complete. Mechanical, electrical, and plumbing fixtures are installed and fully functional. Electrical panel is properly labeled for breaker identification and non-metallic plumbing pipes. AFCI & GFCI Breakers are installed in electrical panel as required for bedrooms, bathrooms, kitchen, exterior outlets, and garage outlets. Exterior lights are installed per plan and city regulations. Okay to issue Certificate of Occupancy for this permit and property.

Documents

File Name Document Type  
CDC 38 SIC-2024-08-07_V1.PDF DOCUMENTS VIEW
CDC 38 RFC LETTER_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CDC 38 D1_V1.PDF DOCUMENTS VIEW
CDC 38 SIC-2023-11-02_V1.PDF DOCUMENTS VIEW