Permit: TC-MDP-1123-01736
Permit Details
Status:
Inspections Complete
Type:
Model Building Permit
Address:
9768 E GRAY HAWK DR
Address NEW:
9768 E GRAY HAWK DR
Apply Date:
11/02/2023
Applicant:
Helen Ormsby
Description:
Casas del Cerrito H35G Model Plan
Permit Reviews
Permit Number - TC-MDP-1123-01736
Permit Status: Inspections complete
Permit Description: Casas del Cerrito H35G Model Plan
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 04/12/2024 | SITE FROM MODEL PERMIT - SUBDIVISION v.2 | 04/18/2024 | APPROVED |
| 03/01/2024 | SITE FROM MODEL PERMIT - SUBDIVISION v.1 | 03/08/2024 | REQUIRES RESUBMIT |
| 08/09/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 08/13/2024 | APPROVED |
| 11/03/2023 | SITE FROM MODEL PERMIT - SUBDIVISION v.1 | 11/14/2023 | APPROVED |
Conditions
Permit Number - TC-MDP-1123-01736
Permit Status: Inspections complete
Permit Description: Casas del Cerrito H35G Model Plan
| Date | Description | Comments |
|---|---|---|
| 11/03/2023 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
| 11/03/2023 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
| 11/13/2023 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
| 08/13/2024 | Post-Tension Inspection Report is required. | |
| 09/11/2023 | Post-Tension Inspection Report is required. | |
| 08/13/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
| 08/24/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
| 11/03/2023 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. | |
| 11/13/2023 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-1123-01736
Permite Description: Casas del Cerrito H35G Model Plan
Total Outstanding Inspections - 2
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/22/2024 | COT - RSBU - Excavation/Rebar/Zoning | N/A | Re-inspection required | 5/22/24: rebar not to schedule at front of house . |
| 05/22/2024 | COT - RSBU - Preslab | N/A | Re-inspection required | 5/22/24: rebar not to schedule at front of house . |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-1123-01736
Permit Description: Casas del Cerrito H35G Model Plan
Total Completed Inspections - 22
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/10/2024 | COT - RSPL - Backwater Valve | Passed | Underground plumbing is properly connected to main sewer line with 2 clean outs and a backwater valve installed, green tracer wire is wrapped around pipe from clean out to sewer tap. Okay to shade pipe and backfill trenches. | |
| 05/10/2024 | COT - RSPL - Rough Soil | Passed | Underground plumbing is properly connected to main sewer line with 2 clean outs and a backwater valve installed, green tracer wire is wrapped around pipe from clean out to sewer tap. Okay to shade pipe and backfill trenches. | |
| 05/10/2024 | COT - RSPL - Sewer | Passed | ||
| 05/10/2024 | COT - RSPL - Yard Water Line | Passed | Water supply line is connected to the city water supply and under street pressure with no leaks. Okay to shade pipe and backfill trench. | |
| 05/22/2024 | BULD - Electrical Clearance | Passed | TEP ECO | |
| 05/22/2024 | COT - RSEL - Electrical Underground | Passed | ||
| 05/22/2024 | COT - RSEL - Grounding/Bonding | Passed | ||
| 05/23/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
| 05/23/2024 | COT - RSBU - Preslab | Passed | ||
| 06/03/2024 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | Exterior walls are properly secured to concrete floor with shot pins, a/b bolts, and masa clips. Shear wall is properly secured per the plan. | |
| 06/03/2024 | COT - RSBU - Roof Nailing | Passed | Roof trusses are properly nailed and secured to the top plate with nails and H2.5 clips nailed per code. | |
| 06/24/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
| 06/24/2024 | COT - RSPL - Gas Pressure Test | Passed | ||
| 07/01/2024 | COT - RSBU - Interior Shear Bracing | Passed | Drywall is properly screwed per plans for the interior shear walls. Okay to proceed with tape, texture, and paint. | |
| 08/05/2024 | COT - BULD - SWG Clearance | Passed | Gas valves are installed at kitchen, laundry room, attic, and garage for stove, dryer, furnace, and hot water heater. Okay to install meter and connect gas. | |
| 08/21/2024 | COT - RSEL - Electrical Final | Passed | Construction is complete. Mechanical, electrical, and plumbing fixtures are installed and fully functional. Electrical panel is properly labeled for breaker identification and non-metallic plumbing pipes. AFCI & GFCI Breakers are installed in electrical panel as required for bedrooms, bathrooms, kitchen, exterior outlets, and garage outlets. Exterior lights are installed per plan and city regulations. Okay to issue Certificate of Occupancy for this permit and property. | |
| 08/21/2024 | COT - RSEL - Outdoor Lighting | Passed | Construction is complete. Mechanical, electrical, and plumbing fixtures are installed and fully functional. Electrical panel is properly labeled for breaker identification and non-metallic plumbing pipes. AFCI & GFCI Breakers are installed in electrical panel as required for bedrooms, bathrooms, kitchen, exterior outlets, and garage outlets. Exterior lights are installed per plan and city regulations. Okay to issue Certificate of Occupancy for this permit and property. | |
| 08/21/2024 | COT - RSME - Mechanical Final | Passed | Construction is complete. Mechanical, electrical, and plumbing fixtures are installed and fully functional. Electrical panel is properly labeled for breaker identification and non-metallic plumbing pipes. AFCI & GFCI Breakers are installed in electrical panel as required for bedrooms, bathrooms, kitchen, exterior outlets, and garage outlets. Exterior lights are installed per plan and city regulations. Okay to issue Certificate of Occupancy for this permit and property. | |
| 08/21/2024 | COT - RSPL - Plumbing Final | Passed | Construction is complete. Mechanical, electrical, and plumbing fixtures are installed and fully functional. Electrical panel is properly labeled for breaker identification and non-metallic plumbing pipes. AFCI & GFCI Breakers are installed in electrical panel as required for bedrooms, bathrooms, kitchen, exterior outlets, and garage outlets. Exterior lights are installed per plan and city regulations. Okay to issue Certificate of Occupancy for this permit and property. | |
| 08/21/2024 | ENGR Engineering Final | Passed | ||
| 08/21/2024 | RSBU - Building Final | Passed | Construction is complete. Mechanical, electrical, and plumbing fixtures are installed and fully functional. Electrical panel is properly labeled for breaker identification and non-metallic plumbing pipes. AFCI & GFCI Breakers are installed in electrical panel as required for bedrooms, bathrooms, kitchen, exterior outlets, and garage outlets. Exterior lights are installed per plan and city regulations. Okay to issue Certificate of Occupancy for this permit and property. | |
| 08/21/2024 | RSBU - Building Progress | Passed | Construction is complete. Mechanical, electrical, and plumbing fixtures are installed and fully functional. Electrical panel is properly labeled for breaker identification and non-metallic plumbing pipes. AFCI & GFCI Breakers are installed in electrical panel as required for bedrooms, bathrooms, kitchen, exterior outlets, and garage outlets. Exterior lights are installed per plan and city regulations. Okay to issue Certificate of Occupancy for this permit and property. |