Permit Details

Status:
Inspections Complete
Type:
Model Building Permit
Address NEW:
9708 E GRAY HAWK DR
Apply Date:
11/01/2023
Applicant:
Helen Ormsby
Description:
Casas del Cerrito H35B Model Plan

Permit Reviews

Permit Number - TC-MDP-1123-01719
Permit Status: Inspections complete
Permit Description: Casas del Cerrito H35B Model Plan
Start Date Submittal Complete Date Status  
01/30/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 02/03/2025 REQUIRES RESUBMIT Review Details
02/06/2024 SITE FROM MODEL PERMIT - PRODUCTION v.2 02/13/2024 APPROVED Review Details
05/23/2024 SITE FROM MODEL PERMIT - PRODUCTION v.1 05/29/2024 APPROVED Review Details
02/11/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.2 02/13/2025 APPROVED Review Details
11/03/2023 SITE FROM MODEL PERMIT - PRODUCTION v.1 11/13/2023 REQUIRES RESUBMIT Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-1123-01719
Permit Status: Inspections complete
Permit Description: Casas del Cerrito H35B Model Plan
Total Outstanding Activity Conditions - 2
Date Name
05/28/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
10/18/2023 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.

Conditions

Permit Number - TC-MDP-1123-01719
Permit Status: Inspections complete
Permit Description: Casas del Cerrito H35B Model Plan
Date Description Comments
11/03/2023 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
11/03/2023 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
11/13/2023 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
11/13/2023 Post-Tension Inspection Report is required.
05/28/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
10/18/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
11/03/2023 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
11/13/2023 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-1123-01719
Permite Description: Casas del Cerrito H35B Model Plan
Total Outstanding Inspections - 4
Last Inspection Date Description Inspector Results Comments
11/20/2024 COT - RSPL - Sewer N/A Canceled 11/20/24: Cancelled by Jorge Teran, underground not complete and not under water pressure test.
11/20/2024 COT - RSPL - Rough Soil N/A Canceled 11/20/24: Cancelled by Jorge Teran, underground not complete and not under water pressure test.
11/20/2024 COT - RSPL - Backwater Valve N/A Canceled 11/20/24: Cancelled by Jorge Teran, underground not complete and not under water pressure test.
01/06/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. N/A Re-inspection required 01/06/25
1. Replace drywall screws on fan mounts throughout.
2. Strap HVAC refrigerant lines above ceiling every 6ft.
3. Nail plates needed throughout.
4. Master bedroom east wall 2x4 in notched more than 40%, needs a stud shoe or sister stud.
5. Flex duct feeding hallway bathroom needs to be supported.
6. Hallway circuit by entry door is tied into bedroom circuits, needs to be on circuit 20 per plan.
7. Seal hole in top plate in master bedroom east wall.

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-1123-01719
Permit Description: Casas del Cerrito H35B Model Plan
Total Completed Inspections - 22
Date Description Inspector Results Comments
11/20/2024 COT - RSPL - Yard Water Line Passed 11/20/24: Main water line is connected to the City water supply system and under street pressure. Okay to shade pipe and backfill trench.
11/21/2024 COT - RSEL - Grounding/Bonding Passed Under ground plumbing approved. Two ground rods in place for UFER attachment. Okay to backfill. Shading required. 11/21/2024
11/25/2024 COT - RSPL - Sewer Passed 11/25/24: Underground plumbing is connected to main sewer line and under water pressure test. Okay to shade pipe and backfill trench.
11/25/2024 COT - RSPL - Rough Soil Passed 11/25/24: Underground plumbing is connected to main sewer line and under water pressure test. Okay to shade pipe and backfill trench.
12/02/2024 BULD - Electrical Clearance Passed 12-2-24, panel approved to be energized. ECO clearance issued to TEP.
12/02/2024 COT - RSBU - Excavation/Rebar/Zoning Passed 12-2-24, excavation/setbacks verified as per approved plans. Okay to pour concrete.
12/02/2024 COT - RSBU - Preslab Passed 12-2-24, preslab approved. Okay to pour concrete.
12/02/2024 COT - RSEL - Electrical Underground Passed 12-2-24, conduit is installed for kitchen island. Okay to pour concrete.
12/02/2024 COT - RSPL - Backwater Valve Passed 12-2-24, backwater valve previously inspected and verified on 11-20-24.
12/13/2024 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed 12/13/24 passed after corrections were made while onsite.
12/13/2024 COT - RSBU - Roof Nailing Passed 12/13/24 pass
01/06/2025 COT - RSPL - Gas Pressure Test Passed
01/07/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 1/7/25 corrections made
01/15/2025 COT - RSBU - Interior Shear Bracing Passed Drywall for interior shear walls is properly secured to studs per plan requirements of 4 & 12. Okay to proceed with tape, texture, and painting of walls and ceiling.
02/27/2025 COT - BULD - SWG Clearance Passed 2-27-25, SWG clearance inspection approved pending City. Okay for SWG to install service-Clearance issued.
02/27/2025 COT - RSEL - Electrical Final Passed 2-27-25, mechanical, electrical, outdoor lighting, plumbing and building final approved pending.
02/27/2025 COT - RSEL - Outdoor Lighting Passed 2-27-25, mechanical, electrical, outdoor lighting, plumbing and building final approved pending.
02/27/2025 COT - RSME - Mechanical Final Passed 2-27-25, mechanical, electrical, outdoor lighting, plumbing and building final approved pending.
02/27/2025 COT - RSPL - Plumbing Final Passed 2-27-25, mechanical, electrical, outdoor lighting, plumbing and building final approved pending.
02/27/2025 RSBU - Building Final Passed 2-27-25, mechanical, electrical, outdoor lighting, plumbing and building final approved pending.
02/28/2025 ENGR Engineering Final Passed
09/19/2025 RSBU - Building Progress Passed

Documents

File Name Document Type  
CDC 48 SIC-2025-02-10_V2.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CDC 48 D1_V1_V1.PDF DOCUMENTS VIEW
CDC 48 NARRATIVE LETTER_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CDC 48 D1_V1.PDF DOCUMENTS VIEW
CDC 48 SIC-2023-11-02_V1.PDF DOCUMENTS VIEW
CDC AVP RELEASE_V1.PDF DOCUMENTS VIEW