Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Re-inspection required
Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.
Permit Number - TC-MDP-1123-01719
Inspection Description - COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.
Inspection Status - Re-inspection required
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/06/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Re-inspection required | 01/06/25 1. Replace drywall screws on fan mounts throughout. 2. Strap HVAC refrigerant lines above ceiling every 6ft. 3. Nail plates needed throughout. 4. Master bedroom east wall 2x4 in notched more than 40%, needs a stud shoe or sister stud. 5. Flex duct feeding hallway bathroom needs to be supported. 6. Hallway circuit by entry door is tied into bedroom circuits, needs to be on circuit 20 per plan. 7. Seal hole in top plate in master bedroom east wall. |
|
| 01/07/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 1/7/25 corrections made |