Permit: TC-MDP-1123-01713
Permit Details
Status:
Inspections Complete
Type:
Model Building Permit
Address:
9762 E GRAY HAWK DR
Address NEW:
9762 E GRAY HAWK DR
Apply Date:
11/02/2023
Applicant:
Helen Ormsby
Description:
Casas del Cerrito H35B Plan
Permit Reviews
Permit Number - TC-MDP-1123-01713
Permit Status: Inspections complete
Permit Description: Casas del Cerrito H35B Plan
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 08/09/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 08/13/2024 | APPROVED |
| 11/03/2023 | SITE FROM MODEL PERMIT - SUBDIVISION v.1 | 11/13/2023 | APPROVED |
Conditions
Permit Number - TC-MDP-1123-01713
Permit Status: Inspections complete
Permit Description: Casas del Cerrito H35B Plan
| Date | Description | Comments |
|---|---|---|
| 11/03/2023 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
| 11/03/2023 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
| 11/13/2023 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
| 11/13/2023 | Post-Tension Inspection Report is required. | |
| 11/02/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
| 11/03/2023 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. | |
| 11/13/2023 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-1123-01713
Permit Description: Casas del Cerrito H35B Plan
Total Completed Inspections - 22
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/10/2024 | COT - RSPL - Rough Soil | Passed | Underground plumbing is properly connected to main sewer line with 2 clean outs and a backwater valve installed, green tracer wire is wrapped around pipe from clean out to sewer tap. Okay to shade pipe and backfill trenches. | |
| 05/10/2024 | COT - RSPL - Sewer | Passed | Underground plumbing is properly connected to main sewer line with 2 clean outs and a backwater valve installed, green tracer wire is wrapped around pipe from clean out to sewer tap. Okay to shade pipe and backfill trenches. | |
| 05/10/2024 | COT - RSPL - Yard Water Line | Passed | Water supply line is connected to the city water supply and under street pressure with no leaks. Okay to shade pipe and backfill trench. | |
| 05/10/2024 | COT - RSPL - Backwater Valve | Passed | Underground plumbing is properly connected to main sewer line with 2 clean outs and a backwater valve installed, green tracer wire is wrapped around pipe from clean out to sewer tap. Okay to shade pipe and backfill trenches. | |
| 05/17/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | Concrete forms are set, post tension cabling is evenly spaced and secured to form, underground electrical is in place for kitchen island, masa clips and shear wall hold downs are properly secured to form per plan requirements, all underground plumbing pipes are wrapped and protected from damage, and rebar reinforcement is installed as required on plans. | |
| 05/17/2024 | COT - RSBU - Preslab | Passed | Concrete forms are set, post tension cabling is evenly spaced and secured to form, underground electrical is in place for kitchen island, masa clips and shear wall hold downs are properly secured to form per plan requirements, all underground plumbing pipes are wrapped and protected from damage, and rebar reinforcement is installed as required on plans. | |
| 05/17/2024 | COT - RSEL - Electrical Underground | Passed | Electrical underground is in place for kitchen island. Okay to pour concrete floor. | |
| 05/17/2024 | BULD - Electrical Clearance | Passed | ECO Clearance issued to TEP. | |
| 05/17/2024 | COT - RSEL - Grounding/Bonding | Passed | Ground rods are properly installed with ground wire connected to both rods and to the electrical panel. | |
| 05/30/2024 | COT - RSBU - Roof Nailing | Passed | ||
| 05/31/2024 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | 5/31/24: Anchor bolts have been installed at main panel bottom plate, stud has been added below girder in front room, RSP Clips added at front entry. Okay to proceed. | |
| 06/21/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
| 06/21/2024 | COT - RSPL - Gas Pressure Test | Passed | ||
| 07/01/2024 | COT - RSBU - Interior Shear Bracing | Passed | Drywall is properly screwed per plans for the interior shear walls. Okay to proceed with tape, texture, and paint. | |
| 08/13/2024 | COT - BULD - SWG Clearance | Passed | ||
| 08/14/2024 | RSBU - Building Progress | Passed | ||
| 08/14/2024 | COT - RSEL - Outdoor Lighting | Passed | Outdoor lighting is properly installed and functional per building plan and city guidelines. | |
| 08/16/2024 | COT - RSEL - Electrical Final | Passed | Construction is complete. Mechanical, electrical, and plumbing fixtures are installed and fully functional. Electrical panel is properly labeled with AFCI & GFCI breakers installed as required. GFCI outlets in bathrooms are fully operational. Okay to issue Certificate of Occupancy. | |
| 08/16/2024 | COT - RSME - Mechanical Final | Passed | Construction is complete. Mechanical, electrical, and plumbing fixtures are installed and fully functional. Electrical panel is properly labeled with AFCI & GFCI breakers installed as required. GFCI outlets in bathrooms are fully operational. Okay to issue Certificate of Occupancy. | |
| 08/16/2024 | COT - RSPL - Plumbing Final | Passed | Construction is complete. Mechanical, electrical, and plumbing fixtures are installed and fully functional. Electrical panel is properly labeled with AFCI & GFCI breakers installed as required. GFCI outlets in bathrooms are fully operational. Okay to issue Certificate of Occupancy. | |
| 08/16/2024 | RSBU - Building Final | Passed | Construction is complete. Mechanical, electrical, and plumbing fixtures are installed and fully functional. Electrical panel is properly labeled with AFCI & GFCI breakers installed as required. GFCI outlets in bathrooms are fully operational. Okay to issue Certificate of Occupancy. | |
| 08/21/2024 | ENGR Engineering Final | Passed |