Inspection Status: Not Ready
Inspection History: COT - BULD - SWG Clearance
| Date |
Description |
Inspector |
Results |
Comments |
| 08/05/2024 |
COT - BULD - SWG Clearance |
|
Not Ready |
Not ready, gas valves not installed, water heater not installed, and pressure gauge still on pipe at kitchen stove. |
| 08/06/2024 |
COT - BULD - SWG Clearance |
|
Re-inspection required |
8/6/24: per previous notes not ready |
| 08/07/2024 |
COT - BULD - SWG Clearance |
|
Canceled |
8/7/24: Cancelled by contractor via text message. Not ready, gas valves not installed, water heater not installed, and pressure gauge still on pipe at kitchen stove. |
| 08/13/2024 |
COT - BULD - SWG Clearance |
|
Passed |
|