Permit: TC-MDP-1025-00705
Permit Details
Status:
Complete
Type:
Model Building Permit
Address:
1315 W SPEEDWAY BL UNIT 2
Address NEW:
1315 W SPEEDWAY BL UNIT 2
Apply Date:
10/29/2025
Applicant:
Brandon Matheson
Description:
ADU Model Plan (Model master plan TC-MDP-0825-00426)
Permit Reviews
Permit Number - TC-MDP-1025-00705
Permit Status: Complete
Permit Description: ADU Model Plan (Model master plan TC-MDP-0825-00426)
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 01/02/2026 | SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.2 | 01/14/2026 | APPROVED |
| 10/31/2025 | SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.1 | 11/13/2025 | REQUIRES RESUBMIT |
Conditions
Permit Number - TC-MDP-1025-00705
Permit Status: Complete
Permit Description: ADU Model Plan (Model master plan TC-MDP-0825-00426)
| Date | Description | Comments |
|---|---|---|
| 10/29/2025 | Please contact Pima County Addressing to resolve issue. Addressing@pima.gov or 520-724-9512 | |
| 10/29/2025 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-MDP-1025-00705
Permite Description: ADU Model Plan (Model master plan TC-MDP-0825-00426)
Total Outstanding Inspections - 3
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/07/2026 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | N/A | Not Ready | Not ready - call in when framing work is complete. |
| 05/11/2026 | COT - BULD - SWG Clearance | N/A | Not Applicable | |
| 05/29/2026 | COT - RSPL - Gas Pressure Test | N/A | Not Applicable |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-1025-00705
Permit Description: ADU Model Plan (Model master plan TC-MDP-0825-00426)
Total Completed Inspections - 18
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/12/2026 | COT - RSPL - Rough Soil | Passed | ||
| 03/19/2026 | COT - RSBU - Excavation/Rebar/Zoning | Passed | 3/19/2026 Corrections made to prior inspection. Ok for concrete placement. |
|
| 03/19/2026 | COT - RSBU - Preslab | Passed | 3/19/2026 Corrections made to prior inspection. Ok for concrete placement. |
|
| 03/19/2026 | COT - RSPL - Sewer | Passed | 3/19/2026 Passed on 3/12/26. |
|
| 04/13/2026 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | ||
| 04/13/2026 | COT - RSBU - Roof Nailing | Passed | 4.13.26 Approved |
|
| 05/06/2026 | COT - RSPL - Yard Water Line | Passed | 05/06/2026 Holding under test with blue tracer wire. Okay to backfill, shading required. |
|
| 05/07/2026 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 05/07/2026 Verified gray water, added blocking to air registers and bracing to DWV and water lines. |
|
| 05/11/2026 | BULD - Electrical Clearance | Passed | 05/11/2026 Clearance TEP ECO. |
|
| 05/15/2026 | COT - RSBU - Interior Shear Bracing | Passed | Passed 5/15/26 | |
| 05/29/2026 | COT - RSEL - Electrical Underground | Passed | ||
| 05/29/2026 | RSBU - Building Progress | Passed | ||
| 07/01/2026 | COT - RSEL - Electrical Final | Passed | ||
| 07/01/2026 | COT - RSEL - Outdoor Lighting | Passed | ||
| 07/01/2026 | COT - RSME - Mechanical Final | Passed | ||
| 07/01/2026 | COT - RSPL - Plumbing Final | Passed | ||
| 07/01/2026 | ENGR Engineering Final | Passed | ||
| 07/01/2026 | RSBU - Building Final | Passed |