Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Inspection Status: Not Ready

Inspection History: ENGR Engineering Final

Date Description Inspector Results Comments
06/26/2026 ENGR Engineering Final Not Ready Accessible Route to unit from driveway has cross slope over 2%.
The Accessible Route at Entryway has a change in level over .25" where it meets Finish Floor. This needs to be beveled to comply.
Schedule this inspection again when ready.
07/01/2026 ENGR Engineering Final Passed