Permit: TC-MDP-1025-00701
Permit Details
Status:
Inspections Complete
Type:
Model Building Permit
Address:
5998 E BENBURB LN
Address NEW:
5998 E BENBURB LN
Apply Date:
10/28/2025
Applicant:
David Alcantar III
Description:
Blackhawk L019 Archer (Model Master Plan TC-MDP-1025-00678)
Permit Reviews
Permit Number - TC-MDP-1025-00701
Permit Status: Inspections complete
Permit Description: Blackhawk L019 Archer (Model Master Plan TC-MDP-1025-00678)
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 12/08/2025 | SITE FROM MODEL PERMIT - SUBDIVISION v.2 | 12/15/2025 | APPROVED |
| 12/15/2025 | RESTAMP - RESIDENTIAL v.1 | 12/16/2025 | APPROVED |
| 11/25/2025 | SITE FROM MODEL PERMIT - SUBDIVISION v.1 | 12/04/2025 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TC-MDP-1025-00701
Permit Status: Inspections complete
Permit Description: Blackhawk L019 Archer (Model Master Plan TC-MDP-1025-00678)
Total Outstanding Activity Conditions - 5
| Date | Name |
|---|---|
| 10/29/2025 | Submit the Air Leakage & Duct Tightness Test Report completed by an Approved Special Inspector prior to Final Inspections. |
| 10/29/2025 | Post-Tension Inspection Report is required. |
| 10/29/2025 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/ |
| 11/25/2025 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. |
| 11/25/2025 | SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED. |
Conditions
Permit Number - TC-MDP-1025-00701
Permit Status: Inspections complete
Permit Description: Blackhawk L019 Archer (Model Master Plan TC-MDP-1025-00678)
| Date | Description | Comments |
|---|---|---|
| 10/29/2025 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
| 10/29/2025 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-1025-00701
Permite Description: Blackhawk L019 Archer (Model Master Plan TC-MDP-1025-00678)
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/23/2026 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | N/A | Re-inspection required | 01/23/2026 Add anchor bolts at marked locations for arms up between masa clips or exceeding 12" from plate edge, add shot pins at marked locations for interior bottom plate edges. |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-1025-00701
Permit Description: Blackhawk L019 Archer (Model Master Plan TC-MDP-1025-00678)
Total Completed Inspections - 20
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/12/2026 | COT - RSPL - Yard Water Line | Passed | 01/12/2026 Holding under test to meter with blue tracer - ok to backfill with shading materials. |
|
| 01/12/2026 | COT - RSPL - Sewer | Passed | 01/12/2026 Holding under test to HCS with green tracer wire - ok to backfill with shading materials. |
|
| 01/12/2026 | COT - RSPL - Rough Soil | Passed | 01/12/2026 All fixtures present & under test - ok to backfill with shading materials. |
|
| 01/16/2026 | COT - RSBU - Preslab | Passed | 01/16/2026 Approved per site plan, setbacks verified and Ufer in place - ok for concrete placement. |
|
| 01/16/2026 | COT - RSEL - Electrical Underground | Passed | ||
| 01/16/2026 | COT - RSBU - Excavation/Rebar/Zoning | Passed | 01/16/2026 Approved per site plan, setbacks verified and Ufer in place. |
|
| 01/23/2026 | COT - RSBU - Roof Nailing | Passed | 01/23/2026 Approved per plan, verified truss calc and roof panels. |
|
| 02/03/2026 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | Approved. Corrections were made. 2/3/2026 | |
| 02/13/2026 | BULD - Electrical Clearance | Passed | 2/13/26: TEP ECO CLEARANCE FOR 5998 E BENBURB LN | |
| 02/17/2026 | COT - RSPL - Gas Pressure Test | Passed | 2.17.26 Approved |
|
| 02/17/2026 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 2.17.26 Approved |
|
| 02/17/2026 | RSBU - Building Progress | Passed | ||
| 02/25/2026 | COT - RSBU - Interior Shear Bracing | Passed | ||
| 03/27/2026 | COT - BULD - SWG Clearance | Passed | 3.27.26 Approved for SWG clearance |
|
| 04/03/2026 | COT - RSEL - Outdoor Lighting | Passed | ||
| 04/03/2026 | COT - RSME - Mechanical Final | Passed | 4.3.26 approved |
|
| 04/03/2026 | COT - RSPL - Plumbing Final | Passed | 4.3.26 approved |
|
| 04/03/2026 | ENGR Engineering Final | Passed | ||
| 04/08/2026 | COT - RSEL - Electrical Final | Passed | 04/08/2026 Correction made to prior inspection. |
|
| 04/08/2026 | RSBU - Building Final | Passed | 04/08/2026 Correction made to prior inspection. |