Permit: TC-MDP-1025-00692
Permit Details
Status:
Inspections Complete
Type:
Model Building Permit
Address:
5975 E BENBURB LN
Address NEW:
5975 E BENBURB LN
Apply Date:
10/28/2025
Applicant:
David Alcantar III
Description:
Blackhawk L021 Clark (Model Master Plan TC-MDP-1025-00679)
Permit Reviews
Permit Number - TC-MDP-1025-00692
Permit Status: Inspections complete
Permit Description: Blackhawk L021 Clark (Model Master Plan TC-MDP-1025-00679)
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 07/17/2026 | SPECIAL INSPECTION REVIEW v.1 | 07/20/2026 | APPROVED |
| 02/23/2026 | SITE FROM MODEL PERMIT - SUBDIVISION v.1 | 02/24/2026 | APPROVED |
Conditions
Permit Number - TC-MDP-1025-00692
Permit Status: Inspections complete
Permit Description: Blackhawk L021 Clark (Model Master Plan TC-MDP-1025-00679)
| Date | Description | Comments |
|---|---|---|
| 10/29/2025 | Submit the Air Leakage & Duct Tightness Test Report completed by an Approved Special Inspector prior to Final Inspections. | |
| 02/23/2026 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. | |
| 02/23/2026 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
| 02/23/2026 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
| 10/29/2025 | Post-Tension Inspection Report is required. | |
| 10/29/2025 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
| 10/29/2025 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/ | |
| 02/23/2026 | SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED. | |
| 10/29/2025 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-1025-00692
Permite Description: Blackhawk L021 Clark (Model Master Plan TC-MDP-1025-00679)
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/07/2026 | ENGR Engineering Final | N/A | Not Ready | Prior to final required documents and special inspections must be satisfied. These include: Air leakage and duct tightness- required documents Epoxy anchors- special inspections Post tension slab- special inspections Post tension Inspection Report- required documents Site preparation- special inspections |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-1025-00692
Permit Description: Blackhawk L021 Clark (Model Master Plan TC-MDP-1025-00679)
Total Completed Inspections - 20
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/16/2026 | COT - RSPL - Rough Soil | Passed | 03/16/2026 All fixtures holding under test - ok to backfill with shading material. |
|
| 03/16/2026 | COT - RSPL - Sewer | Passed | 03/16/2026 Holding under test to HCS with green tracer wire - ok to backfill with shading material. |
|
| 03/16/2026 | COT - RSPL - Yard Water Line | Passed | 03/16/2026 Holding under test to meter with blue tracer wire - ok to backfill with shading material. |
|
| 03/23/2026 | COT - RSBU - Excavation/Rebar/Zoning | Passed | 2.23.26 Approved |
|
| 03/23/2026 | COT - RSBU - Preslab | Passed | 2.23.26 Approved |
|
| 03/23/2026 | COT - RSEL - Electrical Underground | Passed | 2.23.26 Approved |
|
| 04/13/2026 | COT - RSBU - Roof Nailing | Passed | 04/13/2026 All corrections made to prior inspection. |
|
| 04/13/2026 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | 04/13/2026 All corrections made to prior inspection. |
|
| 04/13/2026 | BULD - Electrical Clearance | Passed | 04/13/2026 Approved clearance TEP ECO. |
|
| 05/01/2026 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 05/01/2026 Approved, added nail plates to water and DWV pipes at sill plates and braced exhaust duct midway. |
|
| 05/01/2026 | RSBU - Building Progress | Passed | ||
| 05/11/2026 | COT - RSPL - Gas Pressure Test | Passed | 5.11.26 Approved |
|
| 05/14/2026 | COT - RSBU - Interior Shear Bracing | Passed | ||
| 06/17/2026 | COT - BULD - SWG Clearance | Passed | ||
| 06/24/2026 | COT - RSEL - Electrical Final | Passed | ||
| 06/24/2026 | COT - RSEL - Outdoor Lighting | Passed | ||
| 06/24/2026 | COT - RSME - Mechanical Final | Passed | ||
| 06/24/2026 | COT - RSPL - Plumbing Final | Passed | ||
| 07/02/2026 | RSBU - Building Final | Passed | ||
| 07/15/2026 | ENGR Engineering Final | Passed |