Inspection History Details
Inspection Status: Not Ready
Inspection History: ENGR Engineering Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/07/2026 | ENGR Engineering Final | Not Ready | Prior to final required documents and special inspections must be satisfied. These include: Air leakage and duct tightness- required documents Epoxy anchors- special inspections Post tension slab- special inspections Post tension Inspection Report- required documents Site preparation- special inspections |
|
| 07/14/2026 | ENGR Engineering Final | Passed | ||
| 07/15/2026 | ENGR Engineering Final | Passed |