Permit Details

Status:
Inspections
Type:
Model Building Permit
Address:
2731 S AYALA ST
Address NEW:
2731 S AYALA ST
Apply Date:
03/03/2026
Applicant:
Mark Alteri
Description:
PV 1520 SFR (Model master plan TC-MDP-0124-00024) Rev. 1

Permit Reviews

Permit Number - TC-MDP-1025-00672
Permit Status: Inspections
Permit Description: PV 1520 SFR (Model master plan TC-MDP-0124-00024) Rev. 1
Start Date Submittal Complete Date Status  
06/26/2026 SPECIAL INSPECTION REVIEW v.1 06/29/2026 APPROVED Review Details
03/05/2026 SITE FROM MODEL PERMIT - SUBDIVISION v.1 03/23/2026 APPROVED Review Details

Conditions

Permit Number - TC-MDP-1025-00672
Permit Status: Inspections
Permit Description: PV 1520 SFR (Model master plan TC-MDP-0124-00024) Rev. 1
Date Description Comments
03/09/2026 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
10/22/2025 Post-Tension Inspection Report is required.
10/22/2025 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.
10/22/2025 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/

Outstanding Inspections

Permit Status: Inspections
Permit Number: TC-MDP-1025-00672
Permite Description: PV 1520 SFR (Model master plan TC-MDP-0124-00024) Rev. 1
Total Outstanding Inspections - 2
Last Inspection Date Description Inspector Results Comments
04/29/2026 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing N/A Re-inspection required (with fee) 4-29-26: add anchor bolts at marked locations, add shot pins to marked locations, missing STHD14's at prime suite-see holdown #6, missing anchor bolts at garage shear wall #2, missing keynote 121C at restroom and blocking at 9" above rim of tubs is required-see City of Tucson Inclusive page for details. Provide ladder to inspect roof & parapet nailing. Stopped inspection-additional items may be noted.
04/29/2026 COT - RSBU - Roof Nailing N/A Re-inspection required (with fee) 4-29-26: add anchor bolts at marked locations, add shot pins to marked locations, missing STHD14's at prime suite-see holdown #6, missing anchor bolts at garage shear wall #2, missing keynote 121C at restroom and blocking at 9" above rim of tubs is required-see City of Tucson Inclusive page for details. Provide ladder to inspect roof & parapet nailing. Stopped inspection-additional items may be noted.

Completed Inspections

Permit Status: Inspections
Permit Number: TC-MDP-1025-00672
Permit Description: PV 1520 SFR (Model master plan TC-MDP-0124-00024) Rev. 1
Total Completed Inspections - 15
Date Description Inspector Results Comments
04/03/2026 COT - RSPL - Backwater Valve Passed
04/03/2026 COT - RSPL - Sewer Passed
04/03/2026 COT - RSPL - Rough Soil Passed
04/09/2026 COT - RSBU - Preslab Passed 04/09/2026
Approved per site plan and reinforcement. Okay for concrete placement.
04/09/2026 COT - RSEL - Electrical Underground Passed
04/09/2026 COT - RSBU - Excavation/Rebar/Zoning Passed 04/09/2026
Approved per site plan and reinforcement. Okay for concrete placement.
05/01/2026 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed
05/01/2026 COT - RSBU - Roof Nailing Passed
05/19/2026 BULD - Electrical Clearance Passed 5/19/2026 clearance for TEP ECO.
06/02/2026 COT - RSBU - Firewall/Fire Barrier/Firestop Passed
06/11/2026 COT - RSPL - Yard Water Line Passed
06/11/2026 COT - RSPL - Gas Pressure Test Passed
06/12/2026 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 06/12/2026
Verified DWV holding under test.
06/22/2026 COT - RSBU - Interior Shear Bracing Passed 6-22-26: interior shear bracing/drywall nailing approved.
08/14/2026 COT - BULD - SWG Clearance Passed Clearance for Southwest Gas. 8/14/2026