Inspection Status: Not Ready
Inspection History: COT - RSBU - Roof Nailing
| Date |
Description |
Inspector |
Results |
Comments |
| 04/24/2026 |
COT - RSBU - Roof Nailing |
|
Not Ready |
Provide address and approved plans on site. 4/24/2026 |
| 04/29/2026 |
COT - RSBU - Roof Nailing |
|
Re-inspection required (with fee) |
4-29-26: add anchor bolts at marked locations, add shot pins to marked locations, missing STHD14's at prime suite-see holdown #6, missing anchor bolts at garage shear wall #2, missing keynote 121C at restroom and blocking at 9" above rim of tubs is required-see City of Tucson Inclusive page for details. Provide ladder to inspect roof & parapet nailing. Stopped inspection-additional items may be noted. |
| 05/01/2026 |
COT - RSBU - Roof Nailing |
|
Passed |
|