Permit Details

Status:
Inspections Complete
Type:
Model Building Permit
Apply Date:
10/03/2025
Applicant:
Charles Corrales
Description:
Greenhill grande duplex (Model master plan TC-MDP-1223-01917)

Permit Reviews

Permit Number - TC-MDP-1025-00642
Permit Status: Inspections complete
Permit Description: Greenhill grande duplex (Model master plan TC-MDP-1223-01917)
Start Date Submittal Complete Date Status  
12/10/2025 SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.2 12/19/2025 REQUIRES RESUBMIT Review Details
10/06/2025 SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.1 11/04/2025 REQUIRES RESUBMIT Review Details
02/20/2026 SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.3 03/17/2026 APPROVED Review Details
03/17/2026 ADMINISTRATIVE v.1 N/A REQUIRES RESUBMIT Review Details
04/13/2026 ADMINISTRATIVE v.2 N/A APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-1025-00642
Permit Status: Inspections complete
Permit Description: Greenhill grande duplex (Model master plan TC-MDP-1223-01917)
Total Outstanding Activity Conditions - 2
Date Name
10/06/2025 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.
10/06/2025 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/

Conditions

Permit Number - TC-MDP-1025-00642
Permit Status: Inspections complete
Permit Description: Greenhill grande duplex (Model master plan TC-MDP-1223-01917)
Date Description Comments
10/06/2025 Please contact Pima County Addressing to provide individual unit numbers. Addressing@pima.gov or 520-724-9512
10/20/2025 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.
02/24/2026 Prior to project being finalized applicant must submit permit for 2547 S Campbell Ave.

Outstanding Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-1025-00642
Permite Description: Greenhill grande duplex (Model master plan TC-MDP-1223-01917)
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
08/03/2026 COT - RSEL - Electrical Underground N/A Not Applicable

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-1025-00642
Permit Description: Greenhill grande duplex (Model master plan TC-MDP-1223-01917)
Total Completed Inspections - 16
Date Description Inspector Results Comments
04/24/2026 COT - RSPL - Rough Soil Passed Okay to backfill. Shading required . 4/24/2026
04/24/2026 COT - RSPL - Yard Water Line Passed Okay to backfill. Shading required . 4/24/2026
04/24/2026 COT - RSPL - Sewer Passed Okay to backfill. Shading required . 4/24/2026
04/27/2026 COT - RSBU - Excavation/Rebar/Zoning Passed O4/27/2026
Approved plan and reinforcements. Okay for concrete placement.
04/27/2026 COT - RSBU - Preslab Passed O4/27/2026
Approved per plan and reinforcements. Ufer in place. Okay for concrete placement.
05/05/2026 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed 05/05/2026
Approved plan, verified added nails on northwest corner OSB panel 3/8" from edge, added shot pins 6" from edge on interior sill plate.
05/06/2026 COT - RSBU - Roof Nailing Passed 05/06/2026
Verified added bracing at mechanical trusses throughout.
05/13/2026 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed Passed 5/13/26
05/18/2026 COT - RSBU - Interior Shear Bracing Passed 5/18/2026
Verified final 5/8" type-x gypsum at interior firewall and drywall nail schedule throughout. Okay to tape and texture.
06/17/2026 BULD - Electrical Clearance Passed 6/17/26: TEP ECO CLEARANCE APPROVED 2567 S CAMPBELL AV UNIT 1 & 2
08/03/2026 COT - RSEL - Outdoor Lighting Passed
08/03/2026 COT - RSME - Mechanical Final Passed
08/03/2026 COT - RSEL - Electrical Final Passed
08/03/2026 COT - RSPL - Plumbing Final Passed
08/03/2026 RSBU - Building Final Passed
08/12/2026 ENGR Engineering Final Passed Appropriate thresholds are installed, sewer clean-outs are cut to acceptable height, parking block pins are driven, exposed pvc is painted. Site is complete in accordance with approved plans.

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD (SSRS).PDF DOCUMENTS VIEW
SITE_PLAN_03_H_V3.PDF DOCUMENTS VIEW