Inspection Status: Not Ready
Inspection History: ENGR Engineering Final
| Date |
Description |
Inspector |
Results |
Comments |
| 08/04/2026 |
ENGR Engineering Final
|
|
Not Ready |
Cut sewer cleanouts, replace thresholds, paint exposed pvc, drive parking block pins. |
| 08/12/2026 |
ENGR Engineering Final
|
|
Passed |
Appropriate thresholds are installed, sewer clean-outs are cut to acceptable height, parking block pins are driven, exposed pvc is painted. Site is complete in accordance with approved plans. |