Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Inspections Complete
Type:
Model Building Permit
Address NEW:
6256 S SPRUCE GOOSE AV
Apply Date:
02/26/2026
Applicant:
Celina Rodriguez
Description:
Cielo Reserves 1740 Model Plan (Model master plan TC-MDP-0625-00360)

Permit Reviews

Permit Number - TC-MDP-1025-00608
Permit Status: Inspections complete
Permit Description: Cielo Reserves 1740 Model Plan (Model master plan TC-MDP-0625-00360)
Start Date Submittal Complete Date Status  
03/04/2026 SITE FROM MODEL PERMIT - SUBDIVISION v.1 03/17/2026 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-1025-00608
Permit Status: Inspections complete
Permit Description: Cielo Reserves 1740 Model Plan (Model master plan TC-MDP-0625-00360)
Total Outstanding Activity Conditions - 4
Date Name
03/10/2026 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
03/10/2026 Post-Installed Anchor Inspection Report is required.
10/02/2025 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
10/02/2025 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/

Conditions

Permit Number - TC-MDP-1025-00608
Permit Status: Inspections complete
Permit Description: Cielo Reserves 1740 Model Plan (Model master plan TC-MDP-0625-00360)
Date Description Comments
10/02/2025 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.
03/10/2026 A Special Inspections Intermediate Certificate must be submitted and reviewed prior to issuance of this permit.

Outstanding Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-1025-00608
Permite Description: Cielo Reserves 1740 Model Plan (Model master plan TC-MDP-0625-00360)
Total Outstanding Inspections - 2
Last Inspection Date Description Inspector Results Comments
04/06/2026 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing N/A Re-inspection required 04/06/2026
Add anchor bolts at marked locations, add shot pins to ends of sill plate as marked, add nails to over-penetration on outside shear walls as marked, add h2.5 clip as marked in garage near entrance.
04/20/2026 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. N/A Re-inspection required 4-20-26: block register at kitchen, seal vapor barrier at south wall/west wall at several areas including corner located in master bedroom, fix tears to flex at marked locations, fire foam kitchen exhaust at Boca plate, seal vapor barrier at bedroom 4& 3 and seal all penetrations at top plates, all horizontal penetrations from an unconditioned space to a conditioned space at garage must be sealed. Stopped inspection-additional items may be noted.

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-1025-00608
Permit Description: Cielo Reserves 1740 Model Plan (Model master plan TC-MDP-0625-00360)
Total Completed Inspections - 20
Date Description Inspector Results Comments
03/23/2026 COT - RSPL - Rough Soil Passed 3.23.26
Approved
03/23/2026 COT - RSPL - Sewer Passed 3.23.26
Approved
03/23/2026 COT - RSPL - Yard Water Line Passed 3.23.26
Approved
03/27/2026 COT - RSBU - Excavation/Rebar/Zoning Passed 3.27.26
Approved
03/27/2026 COT - RSBU - Preslab Passed 3.27.26
Approved
03/27/2026 COT - RSEL - Electrical Underground Passed 3.27.26
Approved
04/06/2026 COT - RSBU - Roof Nailing Passed 04/06/2026
Verified truss calcs and roof nailing.
04/07/2026 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed 4.7.26
Corrections made as detailed - approved
04/20/2026 BULD - Electrical Clearance Passed 4-20-26: okay to energize panel. ECO clearance issued to TEP.
04/20/2026 RSBU - Building Progress Passed 4-20-26: okay to energize panel. ECO clearance issued to TEP.
04/20/2026 COT - RSPL - Gas Pressure Test Passed 4-20-26: gas pressure test approved.
04/21/2026 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 04/21/2026
Corrections made to prior inspection, walked rest of house. Added fire foam at range hood and added insulation at water PEX line in garage.
04/28/2026 COT - RSBU - Interior Shear Bracing Passed
06/01/2026 COT - BULD - SWG Clearance Passed 6-1-26: okay to install gas meter. SWG clearance issued.
06/15/2026 COT - RSEL - Electrical Final Passed
06/15/2026 COT - RSEL - Outdoor Lighting Passed
06/15/2026 COT - RSME - Mechanical Final Passed
06/15/2026 COT - RSPL - Plumbing Final Passed
06/15/2026 ENGR Engineering Final Passed
06/15/2026 RSBU - Building Final Passed

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD (SSRS).PDF DOCUMENTS VIEW
CIELO RESERVE - LOT 25 START_V1.PDF DOCUMENTS VIEW
CR 25 SIC-2026-02-26_V1.PDF DOCUMENTS VIEW