Permit: TC-MDP-1024-01248
Permit Details
Apply Date:
10/28/2024
Applicant:
Frank Maldonado
Description:
Model Duplex (Model master plan TC-MDP-0924-00989)
Permit Reviews
Permit Number - TC-MDP-1024-01248
Permit Status: Complete
Permit Description: Model Duplex (Model master plan TC-MDP-0924-00989)
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 11/04/2024 | SITE FROM MODEL PERMIT - SUBDIVISION v.1 | 11/14/2024 | APPROVED |
| 04/03/2025 | SITE FROM MODEL PERMIT - SUBDIVISION v.2 | 04/07/2025 | APPROVED |
| 06/18/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 06/23/2025 | APPROVED |
| 03/21/2025 | SITE FROM MODEL PERMIT - SUBDIVISION v.1 | 03/24/2025 | REQUIRES RESUBMIT |
Conditions
Permit Number - TC-MDP-1024-01248
Permit Status: Complete
Permit Description: Model Duplex (Model master plan TC-MDP-0924-00989)
| Date | Description | Comments |
|---|---|---|
| 10/23/2024 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. | |
| 03/21/2025 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. | |
| 04/03/2025 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. | |
| 10/23/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
| 11/15/2024 | Full payment needed prior to issuance of CofO. | |
| 10/23/2024 | Post-Tension Inspection Report is required. | |
| 10/23/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
| 10/23/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/ | |
| 11/06/2024 | A Special Inspections Certificate, with both Part A and Part B completed, must be submitted and reviewed prior to issuance of this permit. | |
| 12/04/2024 | Prior to project being finalized applicant must provide documentation of a finalized plat. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-MDP-1024-01248
Permite Description: Model Duplex (Model master plan TC-MDP-0924-00989)
Total Outstanding Inspections - 4
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/25/2025 | COT - BULD - SWG Clearance | N/A | Not Applicable | |
| 11/26/2024 | COT - RSEL - Grounding/Bonding | N/A | Partial Pass | 11/26/24: Partial for UFER |
| 06/25/2025 | COT - RSPL - Gas Pressure Test | N/A | Not Applicable | |
| 06/25/2025 | RSBU - Building Final | N/A | Partial Pass | Okay for level 4 TCO. Pending resolution of Sewer Backwater valve needed for C of O. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-1024-01248
Permit Description: Model Duplex (Model master plan TC-MDP-0924-00989)
Total Completed Inspections - 20
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/22/2024 | COT - RSPL - Sewer | Passed | 11/22/24: plumbing underground per plans ok to proceed with backfill. Shading required | |
| 11/22/2024 | COT - RSPL - Rough Soil | Passed | 11/22/24: plumbing underground per plans ok to proceed with backfill. Shading required | |
| 11/26/2024 | COT - RSBU - Preslab | Passed | 11/26/24: reinforcement at footings and slab per plan ok to proceed with pour. | |
| 11/26/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | 11/26/24: reinforcement at footings and slab per plan ok to proceed with pour. | |
| 02/14/2025 | COT - RSBU - Roof Nailing | Passed | 2/14/25 corrections made ok to proceed to intermediate | |
| 02/14/2025 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | 2/14/25 corrections made ok to proceed to intermediate | |
| 04/17/2025 | COT - RSPL - Yard Water Line | Passed | 4-17-25, main water line verified under test. Okay to backfill and continue with construction. | |
| 05/01/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 5-1-25, intermediate inspection approved. Okay to continue with construction. | |
| 05/28/2025 | COT - RSBU - Interior Shear Bracing | Passed | 5-28-25, interior shear bracing approved. Okay for tape & texture | |
| 05/30/2025 | COT - RSEL - Electrical Underground | Passed | ||
| 06/03/2025 | BULD - Electrical Clearance | Passed | 5/30/25: Cover plates required at main panel dead front, bond bushing must be grounded. 6/3/25:ECO TEP CLEARANCE OK TO ENERGIZE |
|
| 06/25/2025 | COT - RSEL - Electrical Final | Passed | ||
| 06/25/2025 | COT - RSEL - Grounding/Bonding | Passed | ||
| 06/25/2025 | COT - RSEL - Outdoor Lighting | Passed | ||
| 06/25/2025 | COT - RSME - Mechanical Final | Passed | ||
| 06/25/2025 | COT - RSPL - Plumbing Final | Passed | ||
| 06/25/2025 | RSBU - Building Progress | Passed | ||
| 08/25/2025 | RSBU - Building Final | Passed | ||
| 08/25/2025 | COT - RSPL - Backwater Valve | Passed | ||
| 08/27/2025 | ENGR Engineering Final | Passed |