Inspection History Details
Inspection Status: Partial Pass
Inspection History: ENGR Engineering Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/25/2025 | ENGR Engineering Final | Partial Pass | Okay for level 4 TCO. Pending resolution of Sewer Backwater valve needed for C of O. | |
| 08/27/2025 | ENGR Engineering Final | Passed |