Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TC-MDP-1024-01241
Permit Details
Apply Date:
10/23/2024
Applicant:
Stephanie Bebee
Description:
PV 2378SFR
Permit Reviews
Permit Number - TC-MDP-1024-01241
Permit Status: Inspections
Permit Description: PV 2378SFR
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
10/28/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 11/14/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-1024-01241
Permit Status: Inspections
Permit Description: PV 2378SFR
Total Outstanding Activity Conditions - 4
Date | Name |
---|---|
10/23/2024 | Post-Tension Inspection Report is required. |
10/23/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/ |
10/30/2024 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. |
10/30/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. |
Conditions
Permit Number - TC-MDP-1024-01241
Permit Status: Inspections
Permit Description: PV 2378SFR
Date | Description | Comments |
---|---|---|
10/23/2024 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. | |
10/23/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
10/30/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Inspections
Permit Number: TC-MDP-1024-01241
Permite Description: PV 2378SFR
Total Outstanding Inspections - 1
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
COT - RSPL - Yard Water Line | N/A | Scheduled |
Completed Inspections
Permit Status: Inspections
Permit Number: TC-MDP-1024-01241
Permit Description: PV 2378SFR
Total Completed Inspections - 2
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
11/21/2024 | COT - RSPL - Rough Soil | Passed | ||
11/21/2024 | COT - RSPL - Sewer | Passed |
Scheduled Inspections
Scheduled Inspections - TC-MDP-1024-01241
Status: Inspections
Description: PV 2378SFR
Scheduled Date | Description | Entered By | Entered Date |
---|---|---|---|
11/22/2024 | COT - RSPL - Yard Water Line | Scheduled |
For information about today’s scheduled inspections please refer to the
PDSD Daily Inspections Dashboards (Desktop)
PDSD Daily Inspections Dashboards (Mobile)
.