Permit Details

Status:
Complete
Type:
Model Building Permit
Apply Date:
11/08/2024
Applicant:
Daria Hopkins
Description:
SFR MERI213021 T21-M0065 (Model master plan TC-MDP-0223-00546)

Permit Reviews

Permit Number - TC-MDP-1024-01233
Permit Status: Complete
Permit Description: SFR MERI213021 T21-M0065 (Model master plan TC-MDP-0223-00546)
Start Date Submittal Complete Date Status  
11/15/2024 SITE FROM MODEL PERMIT - PRODUCTION v.1 12/05/2024 APPROVED Review Details
11/06/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 11/07/2025 APPROVED Review Details

Conditions

Permit Number - TC-MDP-1024-01233
Permit Status: Complete
Permit Description: SFR MERI213021 T21-M0065 (Model master plan TC-MDP-0223-00546)
Date Description Comments
11/06/2025 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
10/21/2024 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.
11/06/2025 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
11/06/2025 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
11/06/2025 Post-Tension Inspection Report is required.
10/21/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.
10/21/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/
11/06/2025 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-MDP-1024-01233
Permite Description: SFR MERI213021 T21-M0065 (Model master plan TC-MDP-0223-00546)
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
11/17/2025 COT - RSPL - Plumbing Final N/A Re-inspection required 11.17.2025
Clean out on driveway not sealed and set.

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-1024-01233
Permit Description: SFR MERI213021 T21-M0065 (Model master plan TC-MDP-0223-00546)
Total Completed Inspections - 21
Date Description Inspector Results Comments
09/04/2025 COT - RSPL - Rough Soil Passed 9-4-25: underground plumbing & sewer connection approved.Okay to backfill with shading materials.
09/04/2025 COT - RSPL - Sewer Passed 9-4-25: underground plumbing & sewer connection approved.Okay to backfill with shading materials.
09/04/2025 COT - RSPL - Yard Water Line Passed 9-4-25: main water line approved.Okay to backfill with shading materials.
09/11/2025 COT - RSBU - Excavation/Rebar/Zoning Passed 9.11.25
APPROVED
09/11/2025 COT - RSBU - Preslab Passed 9.11.25
APPROVED
09/11/2025 COT - RSEL - Electrical Underground Passed 9.11.25
APPROVED
09/18/2025 COT - RSBU - Roof Nailing Passed 9-18-25: okay to dry-in roof.
09/23/2025 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed 9-23-25: exterior/interior clips approved.
10/01/2025 COT - RSPL - Gas Pressure Test Passed 10-1-25: gas pressure test verified.
10/02/2025 BULD - Electrical Clearance Passed 10.2.25
Corrections made
10/02/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 10.2.25
Corrections made
10/09/2025 COT - RSBU - Interior Shear Bracing Passed
11/10/2025 COT - BULD - SWG Clearance Passed 11-10-25: okay to install meter. Clearance issued to SWG.
11/17/2025 COT - RSEL - Electrical Final Passed
11/17/2025 COT - RSEL - Grounding/Bonding Passed
11/17/2025 COT - RSEL - Outdoor Lighting Passed
11/17/2025 COT - RSME - Mechanical Final Passed
11/18/2025 RSBU - Building Final Passed 11.18.2025
Clean out to HCS glued and capped at driveway.
11/17/2025 RSBU - Building Progress Passed
11/18/2025 COT - RSPL - Plumbing Final Passed 11.18.2025
Clean out to HCS glued and capped at driveway.
11/21/2025 ENGR Engineering Final Passed

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL (SSRS).PDF DOCUMENTS VIEW
241720- VALENCIA CROSSING- LOT 5- PT-2025-11-04_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
LOT 5 PLOT PLAN_V1.PDF DOCUMENTS VIEW
LOT 5 SPECIAL INSPECTION CERTIFICATE-2024-11-08_V1.PDF DOCUMENTS VIEW