Permit Details

Status:
Complete
Type:
Model Building Permit
Address NEW:
6105 E CAMPOLINA TR
Apply Date:
10/21/2024
Applicant:
Brian Jones
Description:
Blackhawk T936 - Palm

Permit Reviews

Permit Number - TC-MDP-1024-01218
Permit Status: Complete
Permit Description: Blackhawk T936 - Palm
Start Date Submittal Complete Date Status  
08/22/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.3 08/25/2025 APPROVED Review Details
03/06/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 03/11/2025 REQUIRES RESUBMIT Review Details
08/15/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.2 08/19/2025 REQUIRES RESUBMIT Review Details
10/24/2024 SITE FROM MODEL PERMIT - SUBDIVISION v.1 11/12/2024 APPROVED Review Details

Conditions

Permit Number - TC-MDP-1024-01218
Permit Status: Complete
Permit Description: Blackhawk T936 - Palm
Date Description Comments
10/28/2024 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
10/21/2024 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.
10/28/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
10/28/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
10/21/2024 Post-Tension Inspection Report is required.
10/21/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.
10/21/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/
10/28/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-MDP-1024-01218
Permite Description: Blackhawk T936 - Palm
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
03/18/2025 COT - RSBU - Interior Shear Bracing N/A Re-inspection required Missing part of 4'0c shear wall upstairs

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-1024-01218
Permit Description: Blackhawk T936 - Palm
Total Completed Inspections - 21
Date Description Inspector Results Comments
12/18/2024 COT - RSPL - Rough Soil Passed Tracer wire present, plumbing per plans, holds water, no leaks 12/18/24 ok to backfill
12/18/2024 COT - RSPL - Sewer Passed Tracer wire present, plumbing per plans, holds water, no leaks 12/18/24 ok to backfill
12/18/2024 COT - RSPL - Yard Water Line Passed Tracer wire present, plumbing per plans, holds water, no leaks 12/18/24 ok to backfill
12/27/2024 COT - RSBU - Excavation/Rebar/Zoning Passed Ready for concrete 12/27/24
12/27/2024 COT - RSBU - Preslab Passed Ready for concrete 12/27/24
12/27/2024 COT - RSEL - Electrical Underground Passed Ready for concrete 12/27/24
01/14/2025 COT - RSBU - Roof Nailing Passed Install per plans, corrections made while on site, ok to proceed 1/14/25
01/14/2025 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed Install per plans, corrections made while on site, ok to proceed 1/14/25
02/13/2025 COT - RSEL - Grounding/Bonding Passed Passed 2/13/25
02/13/2025 COT - RSPL - Gas Pressure Test Passed Held pressure 2/13/25
02/20/2025 BULD - Electrical Clearance Passed 2/19/25 approval for TEP ECO
02/20/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 2/19/25 pass
03/19/2025 COT - RSBU - Interior Shear Bracing Passed 19 March 25
Pass
03/28/2025 RSBU - Building Progress Passed
05/01/2025 COT - BULD - SWG Clearance Passed
05/01/2025 COT - RSEL - Outdoor Lighting Passed
05/01/2025 ENGR Engineering Final Passed CO READY
05/16/2025 COT - RSEL - Electrical Final Passed 5/15/25
Pass
05/16/2025 COT - RSME - Mechanical Final Passed
05/16/2025 COT - RSPL - Plumbing Final Passed
05/16/2025 RSBU - Building Final Passed