Permit: TC-MDP-1024-01206
Permit Details
Status:
Inspections
Type:
Model Building Permit
Address:
6102 E CAMPOLINA TR
Address NEW:
6102 E CAMPOLINA TR
Apply Date:
10/15/2024
Applicant:
Chris Irby
Description:
Blackhawk T934 - Frasier
Permit Reviews
Permit Number - TC-MDP-1024-01206
Permit Status: Inspections
Permit Description: Blackhawk T934 - Frasier
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 03/06/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 03/11/2025 | REQUIRES RESUBMIT |
| 10/21/2024 | SITE FROM MODEL PERMIT - SUBDIVISION v.1 | 11/05/2024 | APPROVED |
| 09/04/2026 | BUILDING DEFERRED SUBMITTAL REVIEW v.2 | 09/04/2026 | APPROVED |
Conditions
Permit Number - TC-MDP-1024-01206
Permit Status: Inspections
Permit Description: Blackhawk T934 - Frasier
| Date | Description | Comments |
|---|---|---|
| 10/22/2024 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
| 11/07/2024 | The Contractor you have added to your permit cannot be verified. Please contact staff to have the ROC number added to the account. | |
| 10/15/2024 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. | |
| 10/22/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
| 10/22/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
| 10/15/2024 | Post-Tension Inspection Report is required. | |
| 10/15/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
| 10/15/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/ | |
| 10/22/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Completed Inspections
Permit Status: Inspections
Permit Number: TC-MDP-1024-01206
Permit Description: Blackhawk T934 - Frasier
Total Completed Inspections - 21
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/10/2026 | COT - RSPL - Rough Soil | Passed | 03/10/2026 All fixtures under test - ok to backfill with shading. |
|
| 03/10/2026 | COT - RSPL - Sewer | Passed | 03/10/2026 Holding under test to HCS - ok to backfill with shading. |
|
| 03/10/2026 | COT - RSPL - Yard Water Line | Passed | 03/10/2026 Holding under test - ok to backfill with shading. |
|
| 03/16/2026 | COT - RSBU - Excavation/Rebar/Zoning | Passed | 3/16/2026 Approved per site plan and foundation details. Ok for concrete placement. |
|
| 03/16/2026 | COT - RSBU - Preslab | Passed | 3/16/2026 Approved per site plan and foundation details. Ok for concrete placement. |
|
| 03/16/2026 | COT - RSEL - Electrical Underground | Passed | ||
| 04/07/2026 | BULD - Electrical Clearance | Passed | 04/07/2026 Clearance TEP ECO. |
|
| 04/07/2026 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | 04/07/2026 Corrections made to prior inspections and detailed engineer fix/letter verified. |
|
| 04/07/2026 | COT - RSBU - Roof Nailing | Passed | 04/07/2026 Corrections made to prior inspections and detailed engineer fix/letter verified. |
|
| 04/07/2026 | COT - RSEL - Grounding/Bonding | Passed | 04/07/2026 Tied into MSP. |
|
| 04/07/2026 | COT - RSPL - Gas Pressure Test | Passed | ||
| 04/07/2026 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 04/07/2026 Approved, added foam to top plate holes. |
|
| 04/15/2026 | COT - RSBU - Interior Shear Bracing | Passed | ||
| 05/27/2026 | COT - BULD - SWG Clearance | Passed | 5.27.26 Approved |
|
| 06/01/2026 | COT - RSEL - Electrical Final | Passed | ||
| 06/01/2026 | COT - RSEL - Outdoor Lighting | Passed | ||
| 06/01/2026 | COT - RSME - Mechanical Final | Passed | ||
| 06/01/2026 | COT - RSPL - Plumbing Final | Passed | ||
| 06/01/2026 | RSBU - Building Final | Passed | ||
| 06/01/2026 | RSBU - Building Progress | Passed | ||
| 06/03/2026 | ENGR Engineering Final | Passed | Site is complete in accordance with approved plans. |