Permit: TC-MDP-1024-01202
Permit Details
Status:
Complete
Type:
Model Building Permit
Address:
3601 E NEBRASKA SV
Address NEW:
3601 E NEBRASKA SV
Apply Date:
10/15/2024
Applicant:
Description:
Roca Realty model L 1-12
Permit Reviews
Permit Number - TC-MDP-1024-01202
Permit Status: Complete
Permit Description: Roca Realty model L 1-12
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 10/21/2024 | SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.1 | 11/14/2024 | APPROVED |
Conditions
Permit Number - TC-MDP-1024-01202
Permit Status: Complete
Permit Description: Roca Realty model L 1-12
| Date | Description | Comments |
|---|---|---|
| 10/14/2024 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. | |
| 10/14/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
| 10/14/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/ |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-MDP-1024-01202
Permite Description: Roca Realty model L 1-12
Total Outstanding Inspections - 5
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/11/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | N/A | Re-inspection required | 3/11/25: roof is not loaded, penetrations going through vapor barrier must be sealed, copper piping that will come in contact with stucco must be protected, lath is incomplete. STOPPED INSPECTION MORE ITEMS MAY BE ADDED (no access to home) |
| 03/11/2025 | COT - RSEL - Grounding/Bonding | N/A | Re-inspection required | 3/11/25: roof is not loaded, penetrations going through vapor barrier must be sealed, copper piping that will come in contact with stucco must be protected, lath is incomplete. STOPPED INSPECTION MORE ITEMS MAY BE ADDED (no access to home) |
| 03/11/2025 | BULD - Electrical Clearance | N/A | Re-inspection required | 3/11/25: roof is not loaded, penetrations going through vapor barrier must be sealed, copper piping that will come in contact with stucco must be protected, lath is incomplete. STOPPED INSPECTION MORE ITEMS MAY BE ADDED (no access to home) |
| 06/18/2025 | COT - RSPL - Gas Pressure Test | N/A | Not Applicable | |
| 06/18/2025 | COT - BULD - SWG Clearance | N/A | Not Applicable |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-1024-01202
Permit Description: Roca Realty model L 1-12
Total Completed Inspections - 19
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/27/2024 | COT - RSPL - Rough Soil | Passed | Passed 12/27/24 ok to backfill | |
| 01/13/2025 | COT - RSBU - Excavation/Rebar/Zoning | Passed | Passed 1/13/25 ok to pour concrete | |
| 02/06/2025 | COT - RSPL - Sewer | Passed | 2/6/25 connection per code, ok to backfill | |
| 02/21/2025 | COT - RSBU - Roof Nailing | Passed | 2/21/25 pass | |
| 02/21/2025 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | 2/21/25 pass | |
| 03/18/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 3/18/25 corrections made | |
| 03/18/2025 | COT - RSEL - Grounding/Bonding | Passed | 3/18/25 corrections made | |
| 03/18/2025 | COT - RSBU - Preslab | Passed | Passed at excavation rebar | |
| 03/24/2025 | BULD - Electrical Clearance | Passed | Ready for temp power 3/24/25 CLEARANCE ECO | |
| 04/29/2025 | COT - RSPL - Yard Water Line | Passed | 4-29-25, main water line approved. Okay to backfill-provide shading materials. | |
| 06/18/2025 | ENGR Engineering Final | Passed | ||
| 06/18/2025 | RSBU - Building Progress | Passed | ||
| 06/18/2025 | COT - RSEL - Electrical Underground | Passed | ||
| 06/23/2025 | COT - RSBU - Interior Shear Bracing | Passed | Approved. All corrections were made. 6/23/2025 | |
| 06/23/2025 | COT - RSEL - Electrical Final | Passed | Approved. All corrections were made. 6/23/2025 | |
| 06/23/2025 | COT - RSEL - Outdoor Lighting | Passed | Approved. All corrections were made. 6/23/2025 | |
| 06/23/2025 | COT - RSME - Mechanical Final | Passed | Approved. All corrections were made. 6/23/2025 | |
| 06/23/2025 | COT - RSPL - Plumbing Final | Passed | Approved. All corrections were made. 6/23/2025 | |
| 06/23/2025 | RSBU - Building Final | Passed | Approved. All corrections were made. 6/23/2025 |