Permit Number - TC-MDP-1024-01198
Permit Status: Complete
Permit Description: SFR MERI156021 T21-M0063
Start Date Submittal Complete Date Status  
04/18/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 04/21/2025 APPROVED Review Details
10/21/2024 SITE FROM MODEL PERMIT - PRODUCTION v.1 11/04/2024 APPROVED Review Details

Conditions

Permit Number - TC-MDP-1024-01198
Permit Status: Complete
Permit Description: SFR MERI156021 T21-M0063
Date Description Comments
10/14/2024 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.
10/21/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
10/21/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
10/21/2024 Post-Tension Inspection Report is required.
10/14/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.
10/14/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/
10/21/2024 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
10/21/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-MDP-1024-01198
Permite Description: SFR MERI156021 T21-M0063
Total Outstanding Inspections - 5
Last Inspection Date Description Inspector Results Comments
01/28/2025 COT - RSPL - Rough Soil N/A Re-inspection required No corrections made, still missing clean out.
03/07/2025 BULD - Electrical Clearance N/A Re-inspection required 7 March 25
1. Main panel dead front missing, and temp breaker is missing.
02/04/2025 COT - RSEL - Grounding/Bonding N/A Partial Pass 2/4/25 partial pass, ufer is anchored to footing
05/09/2025 COT - RSEL - Electrical Final N/A Re-inspection required Provide post tension tag at hose bib.Garage lighting tied into garage receptacle. Provide cover plates for light switches in attic. 5/9/2025
05/09/2025 RSBU - Building Final N/A Re-inspection required Provide post tension tag at hose bib.Garage lighting tied into garage receptacle. Provide cover plates for light switches in attic. 5/9/2025

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-1024-01198
Permit Description: SFR MERI156021 T21-M0063
Total Completed Inspections - 22
Date Description Inspector Results Comments
01/24/2025 COT - RSPL - Yard Water Line Passed
01/24/2025 COT - RSPL - Sewer Passed
01/24/2025 COT - RSPL - Backwater Valve Passed
02/04/2025 COT - RSPL - Rough Soil Passed 2/4/25 pass
02/04/2025 COT - RSBU - Excavation/Rebar/Zoning Passed 2/4/25 pass
02/04/2025 COT - RSBU - Preslab Passed 2/4/25 pass
02/04/2025 COT - RSEL - Electrical Underground Passed 2/4/25 pass
02/14/2025 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed Passed 2/14/25 ok to proceed to intermediate stage
02/14/2025 COT - RSBU - Roof Nailing Passed Passed 2/14/25 ok to proceed to intermediate stage
03/06/2025 COT - RSPL - Gas Pressure Test Passed 3-6-25, gas pressure test approved
03/10/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 10 Mar 25
Pass
03/11/2025 BULD - Electrical Clearance Passed 11 March 25
TEP CLEARANCE:ECO
03/19/2025 COT - RSBU - Interior Shear Bracing Passed
04/30/2025 COT - RSEL - Grounding/Bonding Passed
04/30/2025 COT - BULD - SWG Clearance Passed
05/09/2025 COT - RSEL - Outdoor Lighting Passed
05/09/2025 COT - RSME - Mechanical Final Passed
05/09/2025 COT - RSPL - Plumbing Final Passed
05/09/2025 RSBU - Building Progress Passed
05/13/2025 COT - RSEL - Electrical Final Passed
05/13/2025 ENGR Engineering Final Passed CO Ready
05/13/2025 RSBU - Building Final Passed

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
241720 - VALENCIA CROSSING PH2 - LOT 125 - PT-2025-04-16_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
LOT 125 PLOT PLAN_V1.PDF DOCUMENTS VIEW
LOT 125 SPECIAL INSPECTION CERTIFICATE-2024-10-15_V1.PDF DOCUMENTS VIEW