Inspection History Details
Inspection Status: Re-inspection required
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/06/2025 | BULD - Electrical Clearance | Re-inspection required | 3/6/25: UFER ground must be properly secured and accessible at final, properly secure all anchor bolts at shear walls, blocking required at 4-gang box, pex must be 12” away from can lights, seal penetration through top plate at master bathroom, missing dead front and receptacle at main panel. |
|
| 03/07/2025 | BULD - Electrical Clearance | Re-inspection required | 7 March 25 1. Main panel dead front missing, and temp breaker is missing. |
|
| 03/11/2025 | BULD - Electrical Clearance | Passed | 11 March 25 TEP CLEARANCE:ECO |