Permit Details

Status:
Complete
Type:
Model Building Permit
Address NEW:
4731 E JULIAN WASH DR
Apply Date:
11/04/2024
Applicant:
Description:
SFR MERI156021 T21-M0063 (Model Master Plan TC-MDP-0123-00387)

Permit Reviews

Permit Number - TC-MDP-1024-01196
Permit Status: Complete
Permit Description: SFR MERI156021 T21-M0063 (Model Master Plan TC-MDP-0123-00387)
Start Date Submittal Complete Date Status  
11/06/2024 SITE FROM MODEL PERMIT - PRODUCTION v.1 11/25/2024 APPROVED Review Details
05/16/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 05/19/2025 APPROVED Review Details

Conditions

Permit Number - TC-MDP-1024-01196
Permit Status: Complete
Permit Description: SFR MERI156021 T21-M0063 (Model Master Plan TC-MDP-0123-00387)
Date Description Comments
10/14/2024 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.
11/06/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
11/06/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
11/06/2024 Post-Tension Inspection Report is required.
10/14/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.
10/14/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/
11/06/2024 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
11/06/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-MDP-1024-01196
Permite Description: SFR MERI156021 T21-M0063 (Model Master Plan TC-MDP-0123-00387)
Total Outstanding Inspections - 2
Last Inspection Date Description Inspector Results Comments
04/07/2025 COT - RSBU - Roof Nailing N/A Re-inspection required 7 April 25
No corrections made.
03/20/2025 COT - RSEL - Grounding/Bonding N/A Partial Pass 3-20-25, partial pass for ufer only.

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-1024-01196
Permit Description: SFR MERI156021 T21-M0063 (Model Master Plan TC-MDP-0123-00387)
Total Completed Inspections - 21
Date Description Inspector Results Comments
03/13/2025 COT - RSPL - Sewer Passed 13 March 25
Ok to backfill, shading required.
03/13/2025 COT - RSPL - Yard Water Line Passed 13 March 25
Ok to backfill, shading required.
03/13/2025 COT - RSPL - Rough Soil Passed 13 March 25
Ok to backfill, shading required.
03/20/2025 COT - RSBU - Excavation/Rebar/Zoning Passed 3-20-25, reinforcement/setbacks, underground electrical, preslab verified per plans-okay to pour concrete.
03/20/2025 COT - RSBU - Preslab Passed 3-20-25, reinforcement/setbacks, underground electrical, preslab verified per plans-okay to pour concrete.
03/20/2025 COT - RSEL - Electrical Underground Passed 3-20-25, reinforcement/setbacks, underground electrical, preslab verified per plans-okay to pour concrete.
04/15/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed Passed 4/15/25
04/15/2025 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed 4/15/25 corrections made
04/15/2025 COT - RSBU - Roof Nailing Passed 4/15/25 corrections made
04/15/2025 COT - RSEL - Grounding/Bonding Passed Passed 4/15/25
04/15/2025 BULD - Electrical Clearance Passed Passed 4/15/25 CLEARANCE ECO
04/15/2025 COT - RSPL - Gas Pressure Test Passed Passed 4/15/25
04/25/2025 COT - RSBU - Interior Shear Bracing Passed 4-25-25, interior shear wall bracing approved. Okay for tape & texture.
06/09/2025 COT - BULD - SWG Clearance Passed 6-9-25: okay for SWG to install meter. Clearance issued.
06/09/2025 COT - RSEL - Electrical Final Passed 6-9-25: electrical final approved.
06/09/2025 COT - RSEL - Outdoor Lighting Passed 6-9-25: outdoor lighting approved.
06/12/2025 ENGR Engineering Final Passed CO Ready
06/12/2025 RSBU - Building Progress Passed
06/13/2025 COT - RSME - Mechanical Final Passed 6.13.25. All corrections implemented as requested.
06/13/2025 COT - RSPL - Plumbing Final Passed 6.13.25. All corrections implemented as requested.
06/13/2025 RSBU - Building Final Passed 6.13.25. All corrections implemented as requested.

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
241720 - VALENCIA CROSSING - LOT 111 - PT-2025-05-14_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
LOT 111 PLOT PLAN_V1.PDF DOCUMENTS VIEW
LOT 111 SPECIAL INSPECTION CERTIFICATE-2024-11-04_V1.PDF DOCUMENTS VIEW