Permit Details

Status:
Complete
Type:
Model Building Permit
Address NEW:
4723 E JULIAN WASH DR
Apply Date:
11/04/2024
Applicant:
Dana Petty
Description:
SFR MERI132021 T21-M0062 (Model Master plan TC-MDP-0223-00478)

Permit Reviews

Permit Number - TC-MDP-1024-01191
Permit Status: Complete
Permit Description: SFR MERI132021 T21-M0062 (Model Master plan TC-MDP-0223-00478)
Start Date Submittal Complete Date Status  
06/18/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 06/23/2025 APPROVED Review Details
11/06/2024 SITE FROM MODEL PERMIT - PRODUCTION v.1 11/25/2024 APPROVED Review Details

Conditions

Permit Number - TC-MDP-1024-01191
Permit Status: Complete
Permit Description: SFR MERI132021 T21-M0062 (Model Master plan TC-MDP-0223-00478)
Date Description Comments
10/14/2024 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.
11/06/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
11/06/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
11/06/2024 Post-Tension Inspection Report is required.
10/14/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.
10/14/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/
11/06/2024 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
11/06/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-1024-01191
Permit Description: SFR MERI132021 T21-M0062 (Model Master plan TC-MDP-0223-00478)
Total Completed Inspections - 22
Date Description Inspector Results Comments
03/18/2025 COT - RSPL - Yard Water Line Passed Passed 3/18/25 ok to backfill
03/18/2025 COT - RSPL - Sewer Passed Passed 3/18/25 ok to backfill
03/18/2025 COT - RSPL - Rough Soil Passed Passed 3/18/25 ok to backfill
03/18/2025 COT - RSPL - Backwater Valve Passed Passed 3/18/25 ok to backfill
03/25/2025 COT - RSBU - Excavation/Rebar/Zoning Passed Passed 3/25/25 ok to pour concrete
03/25/2025 COT - RSBU - Preslab Passed Passed 3/25/25 ok to pour concrete
03/25/2025 COT - RSEL - Electrical Underground Passed Passed 3/25/25 ok to pour concrete
03/25/2025 COT - RSEL - Grounding/Bonding Passed Passed 3/25/25 ok to pour concrete
05/01/2025 BULD - Electrical Clearance Passed 5-1-25, panel okay to be energized. ECO clearance issued to TEP.
05/01/2025 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed 5-1-25, exterior clip/sheathing approved. Letter submitted & reviewed/approved.
05/01/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 5-1-25, intermediate inspection approved. Okay to continue with construction.
05/01/2025 COT - RSBU - Roof Nailing Passed 5-1-25, exterior clip/sheathing , roof nailing approved. Letter submitted & reviewed/approved.
05/01/2025 COT - RSPL - Gas Pressure Test Passed 5-1-25, gas pressure test approved.
05/15/2025 COT - RSBU - Interior Shear Bracing Passed 5-15-25, interior shear bracing inspection approved. Okay to tape & texture drywall.
06/20/2025 COT - BULD - SWG Clearance Passed Clearance for Southwest Gas. 6/20/2025
06/25/2025 COT - RSEL - Electrical Final Passed
06/25/2025 COT - RSEL - Outdoor Lighting Passed
06/25/2025 COT - RSME - Mechanical Final Passed
06/25/2025 COT - RSPL - Plumbing Final Passed
06/25/2025 ENGR Engineering Final Passed Site is safe and in accordance with approved plans. CofO ready.
06/25/2025 RSBU - Building Final Passed
06/25/2025 RSBU - Building Progress Passed

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
241720 - VALENCIA CROSSING - LOT 113 - PT-2025-06-16_V1.PDF DOCUMENTS VIEW
SPAPP-CERTIFIED FRAMING LETTER-2025-04-23_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
LOT 113 PLOT PLAN_V1.PDF DOCUMENTS VIEW
LOT 113 SPECIAL INSPECTION CERTIFICATE-2024-11-04_V1.PDF DOCUMENTS VIEW