Permit: TC-MDP-1023-01709
Permit Details
Apply Date:
01/25/2024
Applicant:
Joshua Swinney
Description:
Arches Model Plan
Permit Reviews
Permit Number - TC-MDP-1023-01709
Permit Status: Complete
Permit Description: Arches Model Plan
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
02/08/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.2 | 02/15/2024 | APPROVED |
10/21/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 10/21/2024 | APPROVED |
01/26/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 01/30/2024 | REQUIRES RESUBMIT |
Conditions
Permit Number - TC-MDP-1023-01709
Permit Status: Complete
Permit Description: Arches Model Plan
Date | Description | Comments |
---|---|---|
02/15/2024 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. | |
01/12/2023 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
04/05/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
02/15/2024 | Post-Installed Anchor Inspection Report is required. | |
01/26/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
12/12/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
04/05/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. | |
12/12/2023 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. | |
02/15/2024 | SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED. | |
01/12/2023 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. | |
04/05/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-MDP-1023-01709
Permite Description: Arches Model Plan
Total Outstanding Inspections - 9
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
04/01/2024 | COT - RSPL - Rough Soil | N/A | Canceled | Cancelled per Tom McMaster due to wet and rainy day. |
04/01/2024 | COT - RSPL - Yard Water Line | N/A | Canceled | Cancelled per Tom McMaster due to wet and rainy day. |
07/12/2024 | COT - BULD - SWG Clearance | N/A | Not Applicable | No gas appliances in this subdivision. Clearance and gas pressure test not required. |
07/12/2024 | COT - RSPL - Gas Pressure Test | N/A | Not Applicable | No gas appliances in this subdivision. Clearance and gas pressure test not required. |
10/28/2024 | COT - RSEL - Electrical Final | N/A | Re-inspection required | 10/28/24: GFCI required at dishwasher, laundry room no power at receptacle, powder room no receptacle, exterior plastic piping must be coated for uv protection, clean outs must be cut to grade, clean out caps required at driveway , attic access required. |
10/28/2024 | COT - RSEL - Outdoor Lighting | N/A | Re-inspection required | 10/28/24: GFCI required at dishwasher, laundry room no power at receptacle, powder room no receptacle, exterior plastic piping must be coated for uv protection, clean outs must be cut to grade, clean out caps required at driveway , attic access required. |
10/28/2024 | COT - RSME - Mechanical Final | N/A | Re-inspection required | 10/28/24: GFCI required at dishwasher, laundry room no power at receptacle, powder room no receptacle, exterior plastic piping must be coated for uv protection, clean outs must be cut to grade, clean out caps required at driveway , attic access required. |
10/28/2024 | COT - RSPL - Plumbing Final | N/A | Re-inspection required | 10/28/24: GFCI required at dishwasher, laundry room no power at receptacle, powder room no receptacle, exterior plastic piping must be coated for uv protection, clean outs must be cut to grade, clean out caps required at driveway , attic access required. |
10/28/2024 | RSBU - Building Final | N/A | Re-inspection required | 10/28/24: GFCI required at dishwasher, laundry room no power at receptacle, powder room no receptacle, exterior plastic piping must be coated for uv protection, clean outs must be cut to grade, clean out caps required at driveway , attic access required. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-1023-01709
Permit Description: Arches Model Plan
Total Completed Inspections - 19
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
04/05/2024 | COT - RSPL - Rough Soil | Passed | ||
04/05/2024 | COT - RSPL - Yard Water Line | Passed | ||
04/19/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | Concrete forms are set, post tension cabling is in place, rebar reinforcement is installed per plans, UFER Ground is in place, shear wall hold downs are in place per plans, masa clips are properly installed, underground electrical for kitchen island is in place, and all underground plumbing pipes are properly wrapped with foam wrap. Okay to pour concrete for slab and footings. | |
04/19/2024 | COT - RSBU - Preslab | Passed | Concrete forms are set, post tension cabling is in place, rebar reinforcement is installed per plans, UFER Ground is in place, shear wall hold downs are in place per plans, masa clips are properly installed, underground electrical for kitchen island is in place, and all underground plumbing pipes are properly wrapped with foam wrap. Okay to pour concrete for slab and footings. | |
04/19/2024 | COT - RSEL - Electrical Underground | Passed | Concrete forms are set, post tension cabling is in place, rebar reinforcement is installed per plans, UFER Ground is in place, shear wall hold downs are in place per plans, masa clips are properly installed, underground electrical for kitchen island is in place, and all underground plumbing pipes are properly wrapped with foam wrap. Okay to pour concrete for slab and footings. | |
04/19/2024 | COT - RSEL - Grounding/Bonding | Passed | Concrete forms are set, post tension cabling is in place, rebar reinforcement is installed per plans, UFER Ground is in place, shear wall hold downs are in place per plans, masa clips are properly installed, underground electrical for kitchen island is in place, and all underground plumbing pipes are properly wrapped with foam wrap. Okay to pour concrete for slab and footings. | |
05/16/2024 | COT - RSBU - Exterior Clips/Sheathing | Passed | ||
05/16/2024 | COT - RSBU - Roof Nailing | Passed | ||
07/12/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | Mechanical, electrical, and plumbing rough-in are complete. Okay to proceed with insulation and drywall installation. | |
07/25/2024 | COT - RSBU - Interior Shear Bracing | Passed | ||
08/30/2024 | COT - RSPL - Sewer | Passed | 8/30/24: Underground plumbing is connected to sewer with green tracer wire running from clean-out to sewer connection. Okay to shade pipe and backfill trench. | |
08/30/2024 | BULD - Electrical Clearance | Passed | ECO Clearance issued to TEP for 7430 S Keller Ln. Okay to energize panel. | |
09/17/2024 | RSBU - Building Progress | Passed | 9/17/24: 18 inches of copper top and bottom before sweat joint outside of wall main water line | |
10/28/2024 | ENGR Engineering Final | Passed | ||
10/31/2024 | COT - RSEL - Electrical Final | Passed | 10-31-24, previous items that required correction have been made. Final inspection approved. | |
10/31/2024 | COT - RSEL - Outdoor Lighting | Passed | 10-31-24, previous items that required correction have been made. Final inspection approved. | |
10/31/2024 | COT - RSME - Mechanical Final | Passed | 10-31-24, previous items that required correction have been made. Final inspection approved. | |
10/31/2024 | COT - RSPL - Plumbing Final | Passed | 10-31-24, previous items that required correction have been made. Final inspection approved. | |
10/31/2024 | RSBU - Building Final | Passed | 10-31-24, previous items that required correction have been made. Final inspection approved. |