Permit: TC-MDP-1023-01705
Permit Details
Apply Date:
12/14/2023
Applicant:
Joshua Swinney
Description:
Great Sand Dunes SFR Model Escalara
Permit Reviews
Permit Number - TC-MDP-1023-01705
Permit Status: Complete
Permit Description: Great Sand Dunes SFR Model Escalara
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
09/18/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.2 | 09/19/2024 | APPROVED |
12/15/2023 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 12/26/2023 | APPROVED |
09/10/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 09/11/2024 | REQUIRES RESUBMIT |
Conditions
Permit Number - TC-MDP-1023-01705
Permit Status: Complete
Permit Description: Great Sand Dunes SFR Model Escalara
Date | Description | Comments |
---|---|---|
12/26/2023 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as a contact. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. | |
09/11/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
12/15/2023 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
01/20/2023 | Post-Tension Inspection Report is required. | |
09/11/2024 | Post-Tension Inspection Report is required. | |
03/21/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
12/12/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
12/12/2023 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. | |
09/11/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/ | |
09/11/2024 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. | |
01/20/2023 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-MDP-1023-01705
Permite Description: Great Sand Dunes SFR Model Escalara
Total Outstanding Inspections - 4
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
03/28/2024 | COT - RSPL - Gas Pressure Test | N/A | Not Applicable | |
07/01/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | N/A | Re-inspection required | Abs has multiple punctures with staples in great room. Secure loose receptacles. Secure T-stat wire. Secure pex line in bathroom shower. 7/1/2024 |
07/18/2024 | COT - BULD - SWG Clearance | N/A | Not Applicable | |
10/30/2024 | ENGR Engineering Final | N/A | Not Ready | fill in void at foundation next to gate column |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-1023-01705
Permit Description: Great Sand Dunes SFR Model Escalara
Total Completed Inspections - 19
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
03/28/2024 | COT - RSPL - Rough Soil | Passed | ||
03/28/2024 | COT - RSEL - Electrical Underground | Passed | ||
04/12/2024 | COT - RSEL - Grounding/Bonding | Passed | ||
04/15/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
04/15/2024 | COT - RSBU - Preslab | Passed | ||
05/07/2024 | COT - RSBU - Roof Nailing | Passed | ||
05/09/2024 | COT - RSBU - Exterior Clips/Sheathing | Passed | ||
07/05/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 7/5/24: Damaged ABS Pipe has been replaced in great room, loose receptacles have been secured, T-stat wire has been secured, pex lines in bathroom shower have been secured. All other mechanical, electrical, and plumbing rough-in is complete. Okay to proceed with installation of insulation and drywall. | |
07/18/2024 | COT - RSBU - Interior Shear Bracing | Passed | ||
08/27/2024 | BULD - Electrical Clearance | Passed | TEP ECO | |
08/30/2024 | COT - RSPL - Sewer | Passed | 8/30/24: Underground plumbing is connected to sewer with green tracer wire running from clean-out to sewer connection. Okay to shade pipe and backfill trench. | |
09/17/2024 | COT - RSPL - Yard Water Line | Passed | 9/17/24: 18 inches of copper top and bottom before sweat joint outside of wall main water line | |
10/31/2024 | COT - RSEL - Electrical Final | Passed | 10-31-24, items from previous inspection have been corrected. Final approved. | |
10/31/2024 | COT - RSEL - Outdoor Lighting | Passed | 10-31-24, items from previous inspection have been corrected. Final approved. | |
10/31/2024 | COT - RSME - Mechanical Final | Passed | 10-31-24, items from previous inspection have been corrected. Final approved. | |
10/31/2024 | COT - RSPL - Plumbing Final | Passed | 10-31-24, items from previous inspection have been corrected. Final approved. | |
10/31/2024 | ENGR Engineering Final | Passed | ||
10/31/2024 | RSBU - Building Final | Passed | 10-31-24, items from previous inspection have been corrected. Final approved. | |
10/31/2024 | RSBU - Building Progress | Passed | 10-31-24, items from previous inspection have been corrected. Final approved. |