Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Re-inspection required
Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.
| Date |
Description |
Inspector |
Results |
Comments |
| 07/01/2024 |
COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. |
|
Re-inspection required |
Abs has multiple punctures with staples in great room. Secure loose receptacles. Secure T-stat wire. Secure pex line in bathroom shower. 7/1/2024 |
| 07/05/2024 |
COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. |
|
Passed |
7/5/24: Damaged ABS Pipe has been replaced in great room, loose receptacles have been secured, T-stat wire has been secured, pex lines in bathroom shower have been secured. All other mechanical, electrical, and plumbing rough-in is complete. Okay to proceed with installation of insulation and drywall. |